Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

What you learned in Foundations, Groundwork and Site Prep, and how to know you are ready for Stage 2.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isA recap of all of Stage 1, from permits to the tool belt, with links back to every lesson.
Your jobCheck that you can do the work or know who must.
The hard ruleThe drawings, the engineer and your provincial code and OHS regulation beat anything in this book.
The checkEvery item marked Confirm has been looked up for your own project.

The big idea

Stage 1 is the foundation of everything. What is built above ground depends on the accuracy, quality and safety of the work done here. The stage covered the full workflow: permits, plans, ground preparation, forms, rebar, concrete, waterproofing, drainage, backfill, insulation, anchoring, and the tools, gear and safety to do all of it properly. Every later stage depends on it, and mistakes here carry through the whole build.

What you learned

Common Stage 1 mistakes

  • Poor elevation control, so the foundation is uneven
  • Wrong rebar spacing, cover or missing tie-ins
  • Weak forms that bow or blow out
  • Poor vibration, causing honeycombing
  • Skipping waterproofing or drainage steps
  • Backfilling too early or without proper compaction
  • Anchor bolts in the wrong place
  • Digging before the locate is done
  • Working in an unsupported trench
  • Ignoring the weather
  • Using numbers from a US guide or another province instead of your own code and OHS regulation
What pros do differently

They plan layout and elevations before touching a shovel, confirm permits first, read the plans and ask when something is unclear, build straight, square forms, tie rebar cleanly, pour with control, protect the foundation with waterproofing and drainage, compact in correct lifts, adjust for the weather, and keep records and photos.

Before you move on

  • Look up the current building code for your province and your provincial OHS regulation for every item marked Confirm in this stage, for your own project.
  • Check your municipality's requirements, which may add to or change the code.
  • Where the drawings or an engineer give a number, the drawings win.

With Stage 1 done, you are ready for Stage 2: Structural and Building Envelope Systems. The skills you built here support every step of the build.

✅ You are ready whenTap your level
Home DIY
You can say which parts you will do and which need a permit, an engineer or a licensed trade. You have called the locate service, you treat 1.2 m (4 ft) as your own no-entry line for trenches and will not judge sloping or shoring yourself, and you know your inspection stages.
Laborer or helper
You know which tasks you do under direction and which you never do alone. You never enter an excavation that a qualified person has not sloped or shored, you know what locate marks mean, you wear your PPE, and you speak up and stop when something looks wrong.
1st-year apprentice
You can read a foundation plan, lay out lines and elevations, build a simple form, tie rebar and place concrete under supervision. You wear the right PPE and know when to ask.
Apprentice, 2nd to 4th year
You can do your tasks to the plans under a journeyperson: forms, rebar, waterproofing, drainage and anchors. You never judge a trench or platform as safe, and you know which inspections the work must pass.
Journeyperson
You can plan the sequence, check forms, rebar, waterproofing, drainage and anchors against the plans and your provincial code, and run your own readiness check before each inspection. You know where you must stop for an engineer or an inspection.
Lead hand or foreman
You check the crew's work against the plans before it is covered and call each inspection. You enforce the stop-work triggers, you know when to stop for an engineer, and you do not override one.
Contractor or business owner
You have the permits, insurance, workers' compensation registration, safety program, locates and records in place. You know your province's inspection stages and warranty rules, and you price the unknowns.
Starting a new business
You have confirmed your permits, locates, inspection stages, workers' compensation registration and insurance with the authorities. You have lined up engineers and subcontractors for the work you cannot do, and a written safety program and records.
By Province:

Stage 1 follows the National Building Code Part 9 model as each province or territory adopts or amends it, and each has its own OHS regulation and one-call locate service. The editions and rules are on the Permits and Canada by Province lessons, where they were checked. I dropped the old per-province code and fall-protection list on this page because I could not verify it all again here. Confirm with your building department and provincial regulator.

Sources:
  • This page recaps the lessons above. Each lesson lists its own sources and marks what was not verified.

Last reviewed October 2026. General information, not engineering or legal advice.