Slab and Pad Forms
Reviewed by a working tradesman with 17+ years in the field.
Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure
The base, edge forms, steel and joints that set a slab's level, thickness and cracking.
Tap your level and the boxes below open to the advice for you. Remembered on this device.
By the end you can
- Tell slabs on grade, structural slabs, exterior slabs and equipment pads apart.
- Prepare a base, choose a form board tall enough, and set forms to grade.
- Lay out control and isolation joints for a slab.
- Work out volume and the drop for a drainage slope.
- Say when to hold the pour.
Do not pour concrete on a wet, soft or frozen base, and do not put electrical, gas or plumbing under a slab yourself. Pipes under a slab are covered by the drawings and the permit. If you are working in a hole or beside a deep footing trench, the trench rules apply (see Trench Safety). Wet concrete burns skin, so wear waterproof gloves and boots and wash it off at once.
The big idea
Slab forms hold the edges and the level of the concrete. A slab shows every mistake: a 10 mm (3/8 in) high spot, a wrong slope, a bar sitting on the dirt. Get the base, the edges and the steel right before the truck arrives.
Types of slabs and pads
- Slabs on grade: basement floors, garage floors, and crawl-space or utility slabs.
- Structural slabs: engineered, with rebar mats or beams. Built to the drawings.
- Exterior slabs: sidewalks, patios and driveways. These see frost, salt and weather.
- Equipment pads: pads for heat pumps, generators and pumps, set level.
- Thickened-edge slabs: slab edges thickened to act as footings.
Under the model code (NBC Part 9, Section 9.16, read in the Vancouver Building Bylaw 2014):
- Concrete slabs are at least 75 mm (3 in) thick, not counting any topping (9.16.4.3).
- A drainage layer is required below floors-on-ground, except below slabs in garages, carports or accessory buildings (9.16.2.1). The text I read gives no thickness for it, so take it from the drawings and your province's code.
- Dampproofing and waterproofing follow Section 9.13 (9.16.1.4).
- Where floor drains are required, the floor must slope so no water can accumulate (9.16.3.3). No slope value is given.
Minimum strengths for interior floors, garage floors and exterior steps, and the air entrainment for freeze-thaw, are on the Concrete Mathematics page. Check the article numbers and the edition your province adopts, and whether insulation under the slab is required where you are.
Base preparation
A slab is only as good as what is under it.
- Strip topsoil, roots and organic material.
- Compact the subgrade. Replace soft spots with compacted granular fill.
- Place and compact the granular base to the thickness in the drawings.
- Fine-grade the base so slab thickness is even.
- Place the vapour barrier where required, lapped and taped at joints.
- Place insulation where the drawings call for it (heated, frost-protected or energy-code slabs).
Forming materials
- Dimensional lumber: the form board must be at least as tall as the slab is thick. A 38 x 89 mm (2x4) is only 89 mm (3 1/2 in) tall, so for a 100 mm (4 in) slab use a 38 x 140 mm (2x6).
- Stakes (wood or steel), tight to the form and driven below the top.
- Form pins and clamps for commercial work.
- String line and laser for elevation.
- Form release (optional) so boards come off cleanly.
Building slab and pad forms
- Snap lines. Mark the edges and the joint layout.
- Set the form boards. To the line and the elevation.
- Stake them. Tight, so they will not move under screeding.
- Check the elevation. Laser or level along the full perimeter.
- Set the reinforcement. Mesh or rebar on chairs, at the height the drawings specify.
- Install isolation joints. At walls, columns and anything fixed.
- Final walk. Thickness, slope, reinforcement, joints and bracing.
Reinforcement
Welded wire mesh or rebar, as the drawings specify. Many house slabs on grade are unreinforced, so do not add or leave out steel on your own.
- Rebar mats for structural slabs
- Extra bars at thickened edges and around openings
- Chairs, not bricks. Steel on the ground does nothing, and mesh walked into the base does nothing either.
Control, isolation and expansion joints
Concrete shrinks as it cures. Joints decide where it cracks.
- Control joints: a weakened line that makes cracking happen where you want it. The Portland Cement Association guidance says maximum spacing is 24 to 36 times the slab thickness, with panels square or nearly so (length no more than 1.5 times width), and the groove at least 1/4 of the slab thickness and not less than 25 mm (1 in) deep.
- Isolation joints: a separation around columns, walls and anything that moves differently from the slab, using a premoulded filler such as asphalt-impregnated fibre or compressible foam.
- Expansion joints: used between large exterior slabs and fixed structures, as drawn.
Worked example. A 100 mm (4 in) slab: 24 × 0.1 = 2.4 m and 36 × 0.1 = 3.6 m (8 to 12 ft). On a 6 m × 6 m (20 ft × 20 ft) slab, cut joints at 3 m (10 ft) both ways to make four 3 m × 3 m panels. The groove is at least 100 ÷ 4 = 25 mm (1 in) deep.
Saw-cut timing depends on the method: early-entry dry cutting 1 to 4 hours after finishing, conventional wet sawing 4 to 12 hours after, per the same guidance. Keep joints straight, clean and continuous.
Elevation and drainage
- Garage slabs are sloped toward the overhead door or a floor drain.
- Exterior slabs are sloped away from the building.
- Basement slabs are sloped toward floor drains where they are installed.
- Equipment pads must be level.
- Check elevation at the corners, mid-spans and edges.
Your drawings give the slope. As a guide, 1% is 10 mm per metre, about 1/8 in per foot. Example: a 6 m (20 ft) garage slab sloping 1% to the door is 60 mm (about 2 3/8 in) lower at the door end.
Pouring considerations
A 6 m × 6 m slab, 100 mm thick: 6 × 6 × 0.1 = 3.6 m³, about 4.7 yd³, before waste.
- Place evenly so forms are not pushed out of line.
- Screed to the form tops to hold the level.
- Consolidate structural slabs with a vibrator or by rodding.
- Watch the forms for movement during the pour.
- Keep mesh or rebar at its set height.
- Do not place concrete on frozen ground, and do not add water to the mix on site.
Common mistakes
- Wrong elevation or slope
- Weak staking
- Mesh or rebar lying on the ground
- Missing isolation joints
- An uneven base, giving a slab of uneven thickness
- Poor drainage planning
- Pouring onto a wet, soft or frozen base
Set the forms perfectly, because every error shows. Walk the pour with the slope in mind. Exterior slabs that do not drain away from the building fail early.
Hot, windy weather dries the surface too fast and causes cracking. Cold weather slows set and risks frost damage. Rain can wash out the surface and soak the base. Plan finishing and curing around the forecast.
Before a slab pour: base thickness and compaction, vapour barrier, insulation and reinforcement where required, forms and elevation. Book it in advance.
What is the minimum slab thickness in the model code, and how tall must the form board be?
A 6 m × 6 m (20 ft × 20 ft) slab is 100 mm (4 in) thick. How much concrete before waste?
Joints should be spaced at 24 to 36 times the slab thickness. What spacing is that for a 100 mm slab, and how would you lay out a 6 m × 6 m slab?
A 6 m (20 ft) garage slab must slope 1% toward the door. How much lower is the door end?
Why must mesh or rebar sit on chairs, not on the base?
Can you pour on a wet, soft or frozen base?
- Must-haveLayout and measuring:
- Nice to haveLayout by laser: a rotary laser with a receiver
- Must-haveForms:
- Must-haveBase preparation by hand:
- Rent itBase preparation by machine: a plate compactor
- Must-haveBase materials:
- Must-haveReinforcement:
- Must-haveJoints:
- Must-havePouring and screeding:
- Must-haveInsulation where drawn:
- Must-havePPE:
Home DIY
Laborer or helper
1st-year apprentice
Apprentice, 2nd to 4th year
Journeyperson
Lead hand or foreman
Contractor or business owner
Starting a new business
Slab thickness, base, vapour barrier and concrete strength for houses come from NBC Part 9 (Sections 9.16 and 9.3) as each province adopts it, and from CSA A23.1 for exterior and garage concrete. Confirm the clause and your provincial edition.
- BC: BC Building Code. AB, SK, MB, ON, QC: each adopts the model code with its own edition and amendments. Check yours with the local authority.
- NB, NS, PE: footings and foundations are inspected before backfilling. NL: municipal rules apply to houses.
- YT: Whitehorse requires a foundation and under-slab inspection before backfill. NWT, NU: confirm locally.
See Permits and Approvals for the inspection stops, and Canada by Province for the comparison.
- Vancouver Building Bylaw 2014, Division B, Section 9.16 (floors-on-ground; same structure as NBC Part 9)
- Prairie Material, Joints in concrete slabs on grade (control joint spacing, depth and timing; isolation joints)
- Concrete strength and air content: NBC 9.3.1, see Concrete Mathematics. CSA A23.1 is a paid standard.
- Volume and slope arithmetic is calculated and re-checked.
Last reviewed October 2026. General information, not engineering or legal advice.