Sill Plates
Reviewed by a working tradesman with 17+ years in the field.
Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure
The sill plate is the first wood on the foundation. Keep it treated, sealed, bolted and level.
Tap your level and the boxes below open to the advice for you. Remembered on this device.
By the end you can
- Say what a sill plate does and what size the code names.
- Explain why the plate is treated and sealed.
- Install the gasket, plate, washers and nuts in order.
- Check level and moisture protection before framing.
Treated lumber: wear gloves and a dust mask or respirator when cutting or drilling, and do not burn offcuts. Exposed bolt threads can cause impalement and trips, so cap them until the plate goes on.
Do not change anchors. If a bolt is missing, bent or out of place, tell the lead or engineer. Do not enlarge a hole far past the bolt to make it fit.
The big idea
The sill plate is the first piece of wood on the foundation. It gives you a level base to build on, spreads the load into the concrete, holds the anchor bolts, and keeps the framing from soaking up moisture from the concrete. Getting it level, sealed and dry makes every later step easier.
What the code says
From Part 9, Section 9.23, as printed in the Vancouver Building Bylaw 2014 (a municipal reprint, possibly older than your province's edition; I read it through a summarising tool, so check the exact wording):
- Size: sill plates that provide bearing for the floor system are not less than 38 mm × 89 mm (1 1/2 in × 3 1/2 in) (Article 9.23.7.1).
- Level: set them on a full bed of mortar, or directly on a foundation whose top is already level (Sentence 9.23.7.2.(1)).
- Seal: the joint between an exterior sill plate and the foundation is sealed in accordance with Subsection 9.25.3 (Sentence 9.23.7.2.(2)). A foam gasket is the usual way, but the text I read does not mention gaskets.
- Decay and moisture: wood framing that is not pressure-treated and sits on concrete in contact with ground or fill is separated from it by not less than 0.05 mm polyethylene film or Type S roll roofing (Sentence 9.23.2.3.(1)). That separation is not needed where the wood member is at least 150 mm (6 in) above the ground (Sentence 9.23.2.3.(2)).
- Anchors: see Anchor Bolts. Washers and nuts, 100 mm (4 in) embedment, bolts spaced not more than 2.4 m (7 ft 10 1/2 in) in the standard case (Article 9.23.6.1).
The text I read does not give a bolt hole size. Keep the hole just big enough, and follow the drawings.
Materials and gasket
- Pressure-treated lumber marked to the standard your building department accepts is the usual choice. Use the grade and size the drawings call for.
- Field preservative on cut ends and drilled holes, as the treated-lumber maker allows.
- Fasteners and washers made for treated lumber.
- Sill gasket (sill seal): a continuous foam strip under the plate that seals the air gap, stops moisture wicking up, and fills small low spots. Check that the concrete is flat first and fix high spots. Do not use gasket to make up a large gap: use non-shrink grout.
Installation
- Clean. Clear debris, water and ice from the top of the foundation.
- Check. Check the top of the concrete with a laser or level so you know what you are building on.
- Gasket. Lay it the full length with no breaks at the joints.
- Drill. Mark and drill the bolt holes just big enough for the bolt.
- Set. Set the plate over the bolts and tap it into position.
- Fasten. Add washers and nuts and tighten as the code or drawings require.
- Check. Check level and straightness before framing.
Example (numbers made up). A foundation 36 m (118 ft 1 in) around needs 36 m of gasket (plus a little for waste) and, at 2.4 m o.c., about 36 ÷ 2.4 = 15 bolts if the spacing were exactly even. The drawings decide the real count and end distances. The plate is 38 × 89 mm (1 1/2 × 3 1/2 in).
Moisture protection
- Use treated wood and keep the gasket continuous.
- Keep the plate above finished grade. The 150 mm (6 in) figure in the text above is the point where separation is not needed; confirm the clearance for your project.
- Keep soil, mulch and stucco from touching the plate.
- Make sure water drains away from the foundation (see Grading, Downspouts and Window Wells).
Common mistakes
- Untreated lumber directly on concrete
- Bolt holes drilled too large
- No gasket, or gaps in it
- Plates on a wet or dirty top
- Under- or over-tightened nuts
- Plate not level
A level sill makes every floor, wall and roof line after it easier. Take the time to get it right.
Rain soaks the concrete and spoils gasket adhesion. Cold stiffens the gasket. Clear frost from the wall top before you place the plate.
Treated wood, gasket, anchors, washers and nuts, and the sill's level, before framing begins. Confirm what your building department checks.
In the Part 9 text I read, what is the smallest sill plate that provides bearing for the floor?
How must a sill plate be levelled?
An untreated wood member sits on concrete that is in contact with the ground. What does that text require?
How is the joint between an exterior sill plate and the foundation sealed?
A wall 36 m (118 ft 1 in) around has bolts at 2.4 m (7 ft 10 1/2 in). How many bolts in a closed loop?
A bolt hole is drilled much too big. Does it matter?
- Must-haveLayout and measuring:
- Must-haveCutting and drilling:
- Must-haveMaterials: treated sill lumber marked to the treated-wood standard your building department accepts, continuous foam sill gasket, washers and nuts for treated lumber, field preservative for cut ends, non-shrink grout for larger gaps
- Must-haveSetting and tightening:
- Must-haveCleaning the wall top:
- Must-havePPE: hard hat (CSA Z94.1), eye protection (Z94.3), green-triangle safety footwear (Z195), gloves, hearing protection; dust mask or respirator (Z94.4) when cutting treated lumber
Home DIY
Laborer or helper
1st-year apprentice
Apprentice, 2nd to 4th year
Journeyperson
Lead hand or foreman
Contractor or business owner
Starting a new business
Each province adopts its own edition of the National Building Code, and the treated-wood standard and sealing details can differ. I dropped the old per-province list because I could not verify it. Confirm with your building department.
See Canada by Province for the full comparison.
- Vancouver Building Bylaw 2014, Part 9, Section 9.23 (municipal reprint of NBC Part 9; read through a summary, so confirm the wording; Articles 9.23.2.3, 9.23.6.1, 9.23.7.1, 9.23.7.2)
- Subsection 9.25.3 air barrier sealing, bolt hole tolerances and the accepted treated-wood standard were not verified.
Last reviewed October 2026. General information, not engineering or legal advice.