AffiliateForBuilders
We Find. You Build.

Screeding

Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

Screeding sets the level, slope and thickness of the surface right after placement. Everything after it depends on it.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isStriking off the fresh concrete to the level, slope and thickness the drawings call for.
Your jobRide the board on the forms or rails, keep a little concrete in front, and fill low spots right away.
The hard ruleEverything after depends on the screed. A good float cannot fix a bad screed.
The checkRead level and slope at corners, edges and mid-span before the surface stiffens.

By the end you can

  • Hand screed a slab with a straight board and a sawing motion.
  • Choose between hand screed, rails and a powered screed.
  • Check level, slope and thickness while the concrete is still workable.
  • Know when to hand off to floating.
Stop and read

Screeding means kneeling or bending over wet concrete, which burns skin. Wear waterproof alkali-resistant gloves, long sleeves, tall boots and knee pads, and wash off splashes quickly. Keep clear of trucks and pump booms, and of powered screeds while they run. Lift with your legs, because a wet 2x4 or aluminum screed gets heavy.

The big idea

Screeding sets the level, slope and thickness of the surface right after placement. Everything after it depends on it, so a bad screed cannot be fixed with a good float.

Part 9 of the National Building Code calls for a slab on ground at least 75 mm (3 in) thick (9.16.4.3). Your drawings set the actual thickness and slope.

Types of screed

  • Hand screed board: a straight 2x4 or an aluminum strike-off, riding on the forms.
  • Screed rails or pipes: fixed guides set to level, for flatness away from the forms.
  • Vibrating screed: a powered screed for large slabs. The NRMCA flatwork guide says not to use one when slump is above 75 mm (3 in), and to move it rapidly so consolidation is even.
  • Roller screed: for long, wide placements.

Before you screed

  • Forms or rails are level and secure, and checked against the drawings.
  • The slope is set for exterior slabs.
  • Reinforcement sits on chairs, so it will not be dragged.
  • The concrete is placed evenly, with a little extra above the forms.
  • Spread with a square-ended shovel or a come-along. The NRMCA guide says never use a garden rake to move concrete horizontally, because it causes segregation.

Hand screeding

  1. Rest the board Set the board on edge on the forms or rails.
  2. Tilt and pull Tilt it forward and draw it toward you with a slight sawing motion.
  3. Keep a little in front Keep a little concrete ahead of the board to fill low spots. Shovel more in where the board skips.
  4. Fill and re-pass Fill low spots right away and go over them again. Take down high spots before the concrete stiffens.
  5. Keep it clean Scrape the board often. A dirty board leaves ridges.

Powered screeds and rails

  • Set the screed on rails or forms and move it at a steady speed.
  • Let the vibration level and consolidate the surface, but do not build up a thick layer of mortar on top.
  • Check elevation often with a laser or a rod.
  • Keep the roller clean on roller screeds.

Checking level and thickness

  • Use a laser or a grade rod.
  • Check corners, edges and mid-spans.
  • Check the slope on exterior slabs, against the drawings.
  • Make sure thickened edges are full.

Example. A 4 m by 6 m (13 ft 1 in by 19 ft 8 in) slab is ordered at 100 mm (4 in): 4 × 6 × 0.100 = 2.4 m³ (3.14 yd³). If the surface ends up 10 mm (3/8 in) too thick on average, that is 24 m² × 0.010 = 0.24 m³ (0.31 yd³) of concrete you paid for and buried. The sizes are made up.

Hand-off to floating

The NRMCA guide says to begin leveling with a bull float or darby as soon as the concrete is struck off, and to finish that before bleed water appears. Keep the bull float as flat as you can so the surface is not sealed too early.

Then stop. Wait until the bleed water has disappeared before any other finishing. Floating or troweling while it is still bleeding can cause dusting, scaling, crazing, delamination and blisters. The wait depends on the mix and the weather, so test a small area. The next page covers floating.

Common mistakes

  • Pulling too fast, leaving waves
  • Not filling low spots at once
  • Dragging steel with the screed
  • Working the surface too much and bringing up cream
  • Wrong slope
  • A dirty board leaving ridges
Pro note

Take your time with the first pass. A good screed makes every later step easier. A bad one cannot be fixed.

Weather note

Hot weather and wind shorten your time, so screed fast and be ready to float. Cold slows things down. Rain can wash out the surface or change the level.

What the inspector looks at

Slab thickness, slope and level are checked against the drawings.

✅ Check yourselfTap a question
A 4 m by 6 m slab (13 ft 1 in by 19 ft 8 in) is ordered at 100 mm (4 in). The screed leaves it 10 mm (3/8 in) thick on average. How much extra concrete is that?
4 × 6 = 24 m² (258 ft²). 24 × 0.010 = 0.24 m³ (0.31 yd³) extra. Over-thick is money wasted, and under-thick can drop below the 75 mm (3 in) house minimum in Part 9 (9.16.4.3).
What do you keep in front of the screed as you pull it?
A little concrete, to fill any low spots as the board passes.
How do you move the board?
Rest it on the forms or rails, tilt it forward, and draw it toward you with a slight sawing motion.
Can you float while bleed water is on the surface?
No. Wait until it disappears. Finishing too early can cause dusting, scaling, crazing, delamination and blisters.
Why not use a garden rake to move concrete across the slab?
Rakes cause segregation. Use a square-ended shovel or a come-along.
The mix is at 90 mm slump. Should you use a vibrating screed?
The NRMCA guide says not above 75 mm (3 in) slump. Strike off by hand and check the slump against the order.
🧰 Gear for this stepMust-haveRent itNice to have
  • Nice to haveLayout and checking (laser): a laser level with a receiver and a grade rod
  • Must-haveLayout and checking (hand tools): string lines and a tape
  • Must-haveScreeding (hand tools):
  • Rent itScreeding (machine): a vibrating or roller screed for large slabs
  • Must-havePlacing: square-ended shovels and come-alongs to spread concrete ahead of the screed
  • Must-haveConsumables:
  • Must-havePPE:
👷 Who can do thisTap your level
Home DIY
A capable owner can hand screed a small slab with a helper and a straight board. Large or structural slabs need a crew, and powered screeds are for people trained on them.
Laborer or helper
Move material to low spots and keep the board clean as directed. Stay out of the way of the screed and equipment. Do not walk on the surface once it is screeded. Tell your lead if the surface rises or falls.
1st-year apprentice
You can hand screed with a lead beside you. Learn to read the forms, fill low spots right away and keep the board clean.
Apprentice, 2nd to 4th year
Hand screed with a lead beside you. Read the forms, fill low spots right away and keep the board clean. Compare the surface to the check readings and tell your journeyperson if it drifts out of tolerance.
Journeyperson
You own level, slope and thickness, and the call on rails or a powered screed. Stop-work trigger: the surface rising or falling out of tolerance against the check readings. Hand off to floating once the bleed water has gone.
Lead hand or foreman
Set the check readings before screeding starts and assign who takes them. Enforce the stop-work trigger when the surface drifts out of tolerance. Decide with the journeyperson on rails or a powered screed, and hand over to floating when bleed water has gone.
Contractor or business owner
Price rails and power screeds on large slabs. A bad screed shows up as waves and puddles, which is a callback, so document the check readings. Ask your lawyer or insurer about callback and warranty terms.
Starting a new business
Learn what level and flatness the job calls for and what screed gear you really need. Rent rails or a power screed for large slabs and subcontract until your crew is proven. Keep readings on file. Confirm callback and warranty terms with your lawyer and insurer.
By Province:

The technique is the same across Canada. What changes is the code edition and the local slope and thickness rules. NBC Part 9 sets the 75 mm (3 in) minimum for slabs on ground (9.16.4.3). Provinces adopt the code with changes. I did not re-verify provincial code editions on this pass, so confirm yours with the local authority.

See Canada by Province for the full comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.

Scroll to Top