Hold-Downs

Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

A hold-down keeps the end of a braced wall from lifting. The engineer picks it. You place it exactly.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isA steel connector that ties the end of a braced or shear wall to the foundation or the floor below, so it cannot lift.
Your jobPlace the rods exactly where the drawings say, then fit the brackets and fasteners exactly as scheduled.
The hard ruleNo substitutions. If a rod is wrong, stop and call the engineer.
The checkLocation, rod size, embedment, fasteners and tightness, before the wall is covered.

By the end you can

  • Explain what a hold-down does and where it goes.
  • Name the parts of a hold-down system.
  • Say who decides the product, rod and embedment.
  • Check a hold-down before the wall is covered.
Stop and read

Exposed rod threads are a hazard. Rods stick up out of the concrete at hip or knee height and can cause impalement and trips. Cap or guard them where people work or walk.

Structural work is not guesswork. If the drawings give a number, the drawings win. If you are not sure, ask the engineer before the pour, because fixing a missed anchor afterward costs far more. Do not drill cured concrete without dust control.

The big idea

When wind or an earthquake pushes a wall sideways, its end tries to lift. A hold-down keeps it down so the wall can do its job. Whether a building needs them depends on its design and its seismic and wind loads. In engineered buildings and higher-load areas they are common and critical. If a hold-down fails, the wall fails, so give the connectors the same attention you give the rebar.

What the code says

From Part 9, Section 9.23, as printed in the Vancouver Building Bylaw 2014 (a municipal reprint, possibly older than your province's edition; I read it through a summarising tool, so check the exact wording). The text I read does not use the word "hold-down":

  • Building frames shall be anchored to the foundation unless a structural analysis shows anchorage is not needed (Sentence 9.23.6.1.(1)).
  • Where Sa(0.2) is above 1.2, or the 1-in-50 hourly wind pressure is 1.2 kPa or more, anchorage is designed under Part 4 (Sentence 9.23.6.1.(5)). That is where engineered hold-downs come in.
  • Exterior columns and posts shall be anchored to resist uplift and lateral movement (Article 9.23.6.2).
  • Where the wind pressure is 0.8 kPa or more, roof members are tied to the wall framing with connectors that resist a factored uplift load of 3 kN (Sentence 9.23.3.4.(3)).
  • Walls with required braced wall panels shall be continuously supported by joists, blocking or rim joists so the required fastening can be installed (Sentence 9.23.9.8.(6)).

The bracing rules in Part 9 (Subsection 9.23.13) were not in the text I read. Product, rod size and embedment come from the engineer's drawings, and the maker's evaluation report sets the allowable load.

Types of hold-down

  • Cast-in-place: rods or straps set in the concrete before the pour.
  • Bolted hold-downs: a bracket fastened to the post and to the anchor rod.
  • Epoxy-set rods: for retrofits or where the engineer allows (see Epoxy Anchors).
  • High-capacity systems: designed for the project.

Parts of the system: the anchor rod in the concrete, the bracket, washer and nut, the structural screws or bolts into the post, and the post itself (double or triple studs as the drawings call for).

Placement and installation

  1. Locate. Place at the locations on the drawings, not guessed. They are usually at the ends of braced or shear walls. Mark each on the formwork and check before the pour.
  2. Set the rod. Place the rods as the drawings say, plumb, with enough thread for the nut and washer (the length comes from the maker).
  3. Fit the bracket. Centre the rod in the bracket and keep it plumb and flat against the post.
  4. Fasten. Use the screws or bolts the maker specifies and fill every hole it requires.
  5. Tighten. Tighten the nut as the maker says, and check again after the framing shrinks if the maker or drawings call for it.
  6. Inspect. Have the hold-downs inspected before the wall is covered.

Example (numbers made up). The drawings show 6 hold-downs, one at each end of 3 braced wall panels, and 12 screws per bracket. That is 6 × 12 = 72 screws to count and check. Count the real number from the maker's table.

Common mistakes

  • Rod embedment too shallow
  • Rod out of position, so the bracket will not fit
  • Wrong or missing fasteners
  • Bracket not flush with the post
  • Nut not tightened
  • Substituting a different product
Pro note

If a hold-down fails, the wall fails. Photograph every rod, bracket and fastener before the wall is covered.

Weather note

Cold slows the cure of concrete and epoxy, and rain fills drilled holes. Hot weather speeds the cure and can trap air in epoxy. Take extra care with each.

What the inspector looks at

Hold-down locations, rod size, embedment, fasteners and tightness, usually before the walls are covered. Confirm what your building department checks.

✅ Check yourselfTap a question
What does a hold-down do?
It ties the end of a braced or shear wall to the foundation or the floor below, so the end cannot lift when wind or an earthquake pushes the wall sideways.
In the Part 9 text I read, when must anchorage be designed under Part 4?
Where Sa(0.2) is greater than 1.2, or the 1-in-50 hourly wind pressure is at least 1.2 kPa (Sentence 9.23.6.1.(5), as printed in a BC municipal reprint). Check your edition.
Who decides the hold-down product, rod size and embedment?
The engineer or the drawings, and the maker's evaluation report sets the allowable load. Do not substitute a product or a shorter rod.
A rod is 25 mm (1 in) out of position and the bracket will not fit. What do you do?
Stop and call the engineer. Do not bend, cut or force it, and do not drill a new hole without the engineer's direction.
Why re-check the nut after the framing dries?
Wood shrinks, which can leave the nut loose. Check what the maker and the drawings require (some details use a take-up device).
What do exposed rod threads need?
Caps or guards where people work or walk, because they stand at hip or knee height and can cause impalement and trips.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveLayout and measuring:
  • Must-haveFastening: drill/driver or impact driver with the sockets and bits the maker specifies, ratchet and torque wrench
  • Must-haveHardware: the anchor rods, brackets, nuts, washers and structural screws or bolts named on the drawings (no substitutions)
  • Rent itConcrete drilling, if a rod is missed: rotary hammer with dust extraction (see Epoxy Anchors) and a rebar scanner
  • Must-haveProtection: rod caps or guards over exposed threads
  • Must-haveRecords:
  • Must-havePPE: hard hat (CSA Z94.1), eye protection (Z94.3), green-triangle safety footwear (Z195), gloves, hearing protection; respirator (Z94.4) if you drill or cut concrete
👷 Who can do thisTap your level
Home DIY
You can help with layout, cleaning, framing posts and checking hold-down positions against the drawings. Do not choose, change or substitute hold-down hardware or rods, and do not drill cured concrete without dust control. Where the drawings show hold-downs, the engineer or a licensed builder owns the connection.
Laborer or helper
Clean, carry and help position posts as directed. Do not choose, change or swap any hold-down hardware or rod. Tell the lead right away if a rod is missing, short, bent or out of place.
1st-year apprentice
Set and fasten brackets and post screws or bolts under supervision. Learn to read the hold-down schedule and the maker's fastener table first. Ask before you move a rod that is out of position.
Apprentice, 2nd to 4th year
Fasten brackets and screws exactly as the schedule says, and follow the maker's fastener table. Never cut or bend a rod. Ask before moving a rod and report any that sits out of place.
Journeyperson
You own correct placement, plumb, fasteners and tightness, and you check them before the wall is covered. Stop work and call the engineer if a rod is short, shifted or missing. Do not improvise.
Lead hand or foreman
Check placement, plumb and fastener count of every hold-down before the wall is covered, and make sure the inspector sees the connections where required. Stop and call the engineer if a rod is short, shifted or missing.
Contractor or business owner
Price the hardware, the extra inspection visits and a re-check as the framing dries. Keep drawings, photos and the maker's instructions on file, and ask your insurer who carries the cost of a failed connection.
Starting a new business
Know the drawings, the maker's evaluation reports and your province's rules on engineered anchorage. Keep photos and the inspection record, and ask your lawyer or insurer about structural liability.
By Province:

Each province adopts its own edition of the National Building Code, and the seismic and wind loads that decide whether you need hold-downs depend on your location. I dropped the old per-province list because I could not verify it. Follow the engineer's drawings and confirm with your building department.

See Canada by Province for the full comparison.

Sources:
  • Vancouver Building Bylaw 2014, Part 9, Section 9.23 (municipal reprint of NBC Part 9; read through a summary, so confirm the wording; Articles 9.23.3.4, 9.23.6.1, 9.23.6.2, 9.23.9.8)
  • Subsection 9.23.13 bracing, maker installation tables, evaluation reports and provincial rules were not verified.

Last reviewed October 2026. General information, not engineering or legal advice.