Membranes

Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

A barrier on the outside of the wall and a drain at the footing work together to keep a basement dry.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isA barrier on the outside of a below-grade wall, plus drainage that takes water away from it.
Your jobPrepare the wall, apply the barrier from the footing up, detail the joints, and protect it until it is buried.
The hard ruleDampproofing is for damp soil. Where water pressure is expected, you need waterproofing and a professional design.
The checkClean, dry, cured wall; full coverage from footing to grade; photos before backfill.

By the end you can

  • Tell dampproofing from waterproofing and say when each is required.
  • Prepare a wall and apply a membrane with sound details at the footing joint.
  • Describe the drain pipe, gravel and filter fabric around the footing.
  • Protect the membrane through backfill and document it.
Stop and read

Read the safety data sheet for every membrane, primer and coating (WHMIS). Many are solvent-based and give off vapours that are harmful in a closed or low area such as a deep excavation. Use the gloves, eye protection, respirator and ventilation the sheet calls for, and keep ignition sources away from solvent products.

You are working in a hole beside a tall wall. Treat any excavation 1.2 m (4 ft) or deeper as a trench, and follow the Trench Safety page and your provincial OHS regulator. Keep excavations and heavy equipment clear of the footing, because digging below or too close to it can undermine it.

The big idea

Concrete is not waterproof. It soaks up moisture, it cracks, and its joints leak. A barrier between the wall and the soil, plus a drain that takes water away, work together. A barrier with no drainage fails under water pressure, and drainage with no barrier leaves the wall damp.

A cross-section through a foundation wall. Grade slopes away from the house. Free-draining backfill sits against a dimpled drainage mat over dampproofing on the wall. A perforated pipe with holes down sits beside the footing in clear gravel wrapped in filter fabric. Inside, the floor slab sits on gravel.
Foundation drainage in cross-section. Dampproofing on the outside of the wall, a drainage mat over it, and a perforated drain pipe beside the footing in clear gravel wrapped in filter fabric, with the top of the pipe below the underside of the slab. Not to scale. The thin dampproofing coat sits behind the mat and is not drawn separately. Sizes and details: confirm in your provincial code and with the product maker.

Dampproofing or waterproofing?

They are not the same thing, and the code treats them differently (NBC Part 9, Section 9.13, as printed in the Vancouver Building Bylaw 2014).

  • Dampproofing resists moisture from damp soil. Where the exterior finished ground is higher than the inside ground level, the outside of the wall below ground is dampproofed (9.13.2.1). Floors on ground are dampproofed too, unless they sit on at least 100 mm (4 in) of coarse granular material with 10 percent or less passing a 4 mm sieve, or are garage floors.
  • Waterproofing resists water under pressure. Where hydrostatic pressure occurs, waterproofing is required on the outside of below-ground walls and floors on ground (9.13.3.1). The code example is built up from bitumen-saturated membrane layers, and in practice it is an engineered system.

If you expect hydrostatic pressure (high water table, a spring, poor soil), get the design from a professional. A basement that could float or flood is a structural question as well.

Confirm

The accepted materials and standards are listed in 9.13.2.2 and 9.13.3.2, and they change with each code edition. Check the edition your province has adopted, the product's approvals, and your inspector.

Types of membrane

  • Asphaltic coatings (spray or brush, solvent or water based): the cheapest, but they do not bridge cracks and cannot stop water under pressure.
  • Peel-and-stick sheets: rubberized asphalt on a plastic film, with consistent thickness. Some need a primer, and some are rated for cold installation. Check the maker.
  • Liquid-applied membranes (rolled, sprayed or troweled): seamless, but the thickness depends on the applicator, so check it with a wet-film gauge.
  • Dimple mat: a plastic sheet with the dimples facing the wall, which makes an air gap. A building-science article says it is not waterproofing on its own, because it is not sealed at the bottom of the wall.
  • Drainage board (dimples facing out, with a fabric face): protects a waterproofing layer, and is not a stand-alone product. Which way the dimples face depends on the product, so follow the maker.

Surface preparation

  • Strip the forms, then clean off form oil, dirt and loose material.
  • Seal the form-tie holes. Part 9 requires it (9.13.2.4).
  • Patch honeycombing, voids and holes with repair mortar.
  • Let the concrete cure as the maker requires. Some products need a prime coat or a longer cure.
  • The surface must be dry enough for the product. Moisture trapped under a membrane can cause blisters and failure.

Installation

  1. Start at the footing Seal the cold joint where the wall meets the footing with a heavy bead of sealant, and work from there up to the grade line.
  2. Lap and press Lap the seams as the maker says. Press peel-and-stick sheets firmly to remove air pockets and fish-mouths.
  3. Detail the penetrations Seal around pipes, sleeves and corners with the maker's detail.
  4. Terminate at the top Finish at the top with a termination detail, so water cannot run behind the membrane.
  5. Protect it Fit the drainage mat or protection board right away. Rocks and debris tear membranes during backfill.
  6. Inspect and photograph Check for tears, missed spots and short laps before the inspector comes and before backfill, and take dated photos.

The footing-to-wall joint is where leaks start. Water runs along it at footing level, so it needs to be sealed and drained.

The drain

From Part 9, Section 9.14 (as printed in the Vancouver bylaw):

  • The bottom of every exterior foundation wall is drained by drain tile or pipe laid around the foundation, or by a gravel or crushed rock layer, unless it can be shown to be unnecessary (9.14.2.1).
  • The pipe is at least 100 mm (4 in) in diameter, with its top below the bottom of the floor slab (9.14.3.2, 9.14.3.3).
  • The top and sides of the pipe are covered with at least 150 mm (6 in) of crushed stone, with no more than 10 percent passing a 4 mm sieve (9.14.3.3).
  • The drain must go to a sewer, a drainage ditch or a dry well (9.14.5.1). Where gravity drainage is not practical, a sump with an automatic pump is required (9.14.5.2).

Example. A house 10 m by 8 m (32 ft 10 in by 26 ft 3 in) has a 36 m (118 ft) perimeter. With 2.4 m (7 ft 10 in) of wall below grade, that is 36 × 2.4 = 86.4 m² (930 ft²) of wall to dampproof, and 36 m of drain pipe. With a 100 mm (4 in) pipe and 150 mm (6 in) of stone on top and both sides, the gravel bundle is 400 mm (15 3/4 in) wide and about 300 mm (11 3/4 in) high, if you allow 50 mm (2 in) under the pipe. That is 0.4 × 0.3 × 36 = 4.3 m³ (5.7 yd³) before the pipe and an allowance. The sizes and the bedding are made up.

The next pages cover sump systems and drainage corrections.

Radon rough-in

Part 9 also asks for a soil-gas rough-in. Houses get an air barrier on the assemblies separating the house from the ground, and a subfloor depressurization rough-in, unless the building is in a Radon Area 2 location (9.13.4.2). One option is at least 100 mm (4 in) of granular material under the slab with a vent pipe of at least 100 mm (4 in) diameter, labelled "RADON VENT PIPE" (9.13.4.3). Ask your inspector what your province requires, and plan the rough-in before the slab is poured.

Common mistakes

  • Applying to a wet, dirty or uncured wall
  • Short laps
  • Air pockets and fish-mouths in the sheet
  • No protection during backfill
  • Missing coverage at the joint and penetrations
  • Dampproofing where water pressure is expected
Pro note

A single tear can let water through the whole wall. Inspect it before backfill and photograph it. It is cheap insurance.

Weather note

Cold stiffens sheets and weakens adhesion, and many products have a minimum temperature, so check the maker. Heat softens adhesives. Rain and frost trap moisture under the product.

What the inspector looks at

Coverage from footing to grade, laps, the footing joint, penetrations, and protection against backfill damage. Many inspectors want to see the dampproofing and drain before backfill goes on.

✅ Check yourselfTap a question
A house is 10 m by 8 m (32 ft 10 in by 26 ft 3 in), with 2.4 m (7 ft 10 in) of wall below grade. How much wall area needs dampproofing, and how long is the drain?
Perimeter 2 × (10 + 8) = 36 m (118 ft). Wall area 36 × 2.4 = 86.4 m² (930 ft²). The drain runs the whole 36 m.
How much clean gravel does that drain bundle need, with a 100 mm (4 in) pipe and 150 mm (6 in) of stone on top and both sides?
Width 100 + 150 + 150 = 400 mm, height about 300 mm with 50 mm under the pipe: 0.4 × 0.3 × 36 = 4.3 m³ (5.7 yd³), before the pipe and an allowance. The 50 mm under the pipe is my assumption.
When does NBC Part 9 require dampproofing of a foundation wall?
Where the exterior finished ground is higher than the inside ground level, the outside of the wall below ground gets dampproofed (9.13.2.1).
What changes if you expect hydrostatic pressure?
Dampproofing is not enough. The code calls for waterproofing (9.13.3.1), and you should get the design from a professional.
Which way does the perforated drain pipe sit, and how high?
Holes down, with the top of the pipe below the underside of the floor slab (9.14.3.3), covered by at least 150 mm (6 in) of crushed stone on top and sides.
Why photograph the membrane before backfill?
Once it is buried, a tear or a missed joint cannot be seen or fixed. Dated photos are your proof for the inspector and for any warranty claim.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveLayout and measuring: tape measure, chalk line and a 1.2 m (4 ft) level to mark the grade line and check the termination height
  • Must-haveSurface prep (hand tools):
  • Nice to haveSurface prep (grinder): a grinder with a dust shroud for rough spots
  • Must-haveApplying:
  • Must-haveDetails:
  • Must-haveRecords: a camera or phone for photos of the membrane before it is covered
  • Must-havePPE: hard hat (CSA Z94.1), eye protection (CSA Z94.3), green-triangle boots (CSA Z195), chemical-resistant gloves, and a respirator (CSA Z94.4) with cartridges matched to the safety data sheet
👷 Who can do thisTap your level
Home DIY
A capable owner can prepare a shallow wall and apply a membrane or coating on a small area, if the maker's instructions are followed. Treat 1.2 m (4 ft) as a no-entry line and do not judge sloping or shoring yourself. A dig beside an existing foundation is not a DIY job, so hire a pro. Hire a pro for any basement with water pressure or a high water table. Solvent products in a low hole are a vapour hazard.
Laborer or helper
Help with cleanup and moving rolls, primer and tools. Never enter an excavation 1.2 m (4 ft) or deeper, and stay away from cracked or leaning walls. Solvent products in a low hole are a vapour hazard, so do not use them there.
1st-year apprentice
Under supervision, clean and prime the wall, apply sheets and seal details, and take photos. Learn first how the footing joint leaks, the maker's lap and temperature limits, and the safety data sheet (WHMIS).
Apprentice, 2nd to 4th year
Clean, prime, apply sheets and seal details under a journeyperson, and take dated photos. Learn the maker's lap and temperature limits. You never decide that a wall or excavation is safe. Step back and report if anything moves.
Journeyperson
You own the system choice (dampproofing or waterproofing), the details at the footing, penetrations and top, and the readiness check before the inspector sees it. Stop-work trigger: do not cover the wall if it is dirty, wet or uncured, or if the temperature is outside the maker's limit. Stop and call an engineer where water pressure is expected.
Lead hand or foreman
Check that the wall is clean, dry and cured and that the temperature is within the maker's limit before work starts. Enforce the stop-work trigger and keep the 1.2 m (4 ft) no-entry line for unprotected excavations. Photograph before backfill. Call the engineer where water pressure is expected.
Contractor or business owner
Price the system by wall area and detail work, and subcontract specialist waterproofing where a warranty is needed. Document coverage with dated photos before backfill. Check the permit and inspection stage, WHMIS training and excavation safety. A failed membrane is a common warranty claim, so keep the records.
Starting a new business
Learn the difference between dampproofing and waterproofing before you quote. Subcontract specialist waterproofing where a warranty is needed. Confirm the inspection stage with your building department, WHMIS and excavation rules with your provincial regulator, and coverage with your insurer.
By Province:

The technique is the same across Canada. What changes is the code edition and local inspection stages. I read Sections 9.13 and 9.14 as printed in the Vancouver Building Bylaw 2014, which may not match the current edition in your province, so check the clause numbers and limits against the edition you work under. Radon requirements and inspection stages vary, so confirm them with your local building department.

See Canada by Province for the full comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.