Move the drawings onto the ground: position, squareness and elevation, set from a benchmark that does not move.
Tap your level and the boxes below open to the advice for you. Remembered on this device.
By the end you can
- Explain what pins, setbacks and benchmarks are and who sets each one.
- Build batter boards and run string lines that survive the excavation.
- Square a footprint with 3-4-5 and equal diagonals, and work out the diagonal.
- Set and check elevations from a benchmark, and test a laser with a two-peg test.
- Name the common layout mistakes and when to stop and call a surveyor.
Never move a pin, stake or benchmark, and never guess a property line. If pins are missing, disturbed or in doubt, or the building sits near a line or a floodplain, stop and have a licensed land surveyor re-establish them. Keep clear of excavators and trucks while you set stakes, and wear your hard hat and hi-vis when machines are working.
The big idea
Layout moves the drawings onto the ground. If the layout or elevation is wrong, every trade after you pays for it: footings in the wrong spot, a building that does not fit its setbacks, floors that do not meet the door sills. Layout does five jobs:
- Transfers the drawings to the ground
- Sets the finished floor elevation (FF)
- Sets footing, wall, slab and column elevations
- Squares and aligns the footprint
- Leaves permanent control points for the trades that follow
Survey, pins and setbacks
- Property pins are survey markers at the legal corners of the lot. If they are missing, disturbed or in doubt, have a licensed land surveyor re-establish them before you lay out near a line. In BC that is a BC Land Surveyor.
- Setbacks come from the zoning bylaw and are measured from the lot lines. A permit can be refused, or a stop-work order issued, for a structure that is too close.
- Some local governments require a survey certificate after the foundation is formed or poured, to confirm setbacks before framing starts. Ask whether yours does.
- Sites in a floodplain can have a required minimum elevation for the lowest floor, called a flood construction level, set by local bylaw.
Whether your municipality requires a post-foundation survey certificate, and what flood construction levels apply to your lot, depends on the local government. Ask the building department. Neither requirement is universal.
Benchmarks and control points
- Primary benchmark (BM): a fixed elevation reference that will not move, such as a curb, a set pin, a building corner or a rock.
- Secondary benchmarks: backups placed around the site.
- Control points: gridlines, centrelines, offsets and corner points.
Find out which datum the drawings use. Some are tied to real geodetic elevations. Others use an arbitrary site number like 100.00 m (or 100.00 ft). Never mix them. Protect your benchmark, because if it moves the whole building moves.
Finished floor elevation (FF)
- Confirm FF from the approved drawings.
- Transfer it from the benchmark with a laser level.
- Mark it on stakes, batter boards or a fixed object.
- Use it to find footing elevation, top of wall, slab base, door thresholds, driveway slope and deck or landing heights.
Lasers and grade rods
Used to set footing depth, top-of-wall elevation, slab base, pad elevation, step-downs and trench depth. On commercial and civil work a total station is used for high-accuracy layout.
- Check the laser with a two-peg test before you rely on it (below).
- Re-check the height of instrument (HI) on the benchmark every time the tripod is moved.
- A grade rod can read in millimetres or in feet, tenths and hundredths of a foot. Know which one yours is.
Two-peg test
Set two pegs about 30 m (100 ft) apart. The test finds whether the laser is truly level.
- Set up in the middle. Put the laser halfway between the pegs, 15 m (50 ft) from each. Read the rod on peg A and peg B. Any laser error is the same at both pegs, so it cancels. The difference is the true difference in height.
- Move to one end. Set the laser about 1 m (3 ft) from peg A, on the line. Read both pegs again.
- Compare. Compare the difference between the two readings from the new setup with the true difference from step 1. The gap is the laser error over the extra distance.
- Judge it. Compare the error with the accuracy the maker states for your laser. If it is worse, do not rely on it. Get it checked or calibrated.
Example. Setup 1: rod on A reads 1.512 m, rod on B reads 1.438 m. B is higher by 1.512 − 1.438 = 0.074 m. Setup 2, near A: A reads 1.420 m and B reads 1.341 m, so B looks higher by 0.079 m. The error is 0.079 − 0.074 = 0.005 m, or 5 mm over about 29 m. In imperial that is about 3/16 in over 95 ft.
Batter boards
Batter boards hold your string lines outside the excavation, so the layout survives the digging.
- Drive stakes at the corners. Place them accurately at the project corners.
- Set the batter board stakes outside. About 1.5 m (5 ft) out from each corner stake, drive 25 x 100 mm (1x4 in) stakes. Leave room for the trench and the machine.
- Build the boards. Each board is 1.2 to 1.5 m (4 to 5 ft) long, so the string stays clear of the trench. Level the tops to a known elevation.
- Run the strings. Stretch line between boards for wall edges, centrelines and footing lines. Use a line level or the laser to confirm it is level.
- Mark the string positions. Cut small kerfs in the boards so the strings can be restrung in exactly the same place.
- Transfer with a plumb bob. Hang the plumb bob from the string crossing to the pin to mark the corner. It takes two people.
- Re-check. Check the boards after rain, frost and machine traffic.
Squaring the structure
- 3-4-5: measure 3 units along one line and 4 along the other from the same corner. The diagonal between the marks must be 5. In metric use 900, 1200 and 1500 mm, or 3 m, 4 m and 5 m. In imperial use 3 ft, 4 ft and 5 ft. Bigger multiples such as 6-8-10 or 9-12-15 give more accuracy over distance.
- Diagonals: on a rectangle, the two diagonals must be equal.
- Laser alignment for long runs, and a total station for commercial and civil layout.
Working out the diagonal
Diagonal = √(length² + width²). For a 12 m × 8 m building: √(144 + 64) = √208 = 14.42 m. For a 40 ft × 26 ft building: √(1600 + 676) = √2276 = 47.71 ft, which is 47 ft 8 1/2 in (0.71 × 12 = 8.5 in). Measure both diagonals. If they match each other and match the number, the building is square and the size is right.
Elevation changes and step-downs
Mark these clearly before excavation or forming: garage step-downs, basement transitions, frost wall elevation changes, slab depressions (showers, mechanical rooms, elevator pits), loading docks and machine bases, and drainage channels.
- Residential: footings, walls, slabs, columns, beam pockets.
- Commercial: gridlines, column centres, shear walls, slab depressions.
- Industrial: machine bases, anchor bolt templates, heavy pads.
- Civil: centrelines, drainage slopes, culverts, utility depths.
The layout workflow
- Check the current drawings and the pins. Confirm the revision. Find the legal pins. Call a surveyor if any are missing or in doubt.
- Set the benchmark. Choose something that will not move, write its elevation, and photograph it.
- Set the corner stakes. Use the drawing dimensions and the setbacks.
- Square it. Use 3-4-5 at each corner and check both diagonals.
- Set the batter boards and strings. Outside the excavation, levelled to a known elevation.
- Transfer elevations. Set the laser on the benchmark, find the height of instrument, and mark FF and footing depths.
- Protect and re-check. Re-check after the dig, after rain and frost, and after machines have been working around the layout.
Common mistakes
- A wrong or disturbed benchmark
- A laser out of level, or reading from the wrong datum
- Wrong offsets
- Sagging string lines
- Layout moved by the excavator
- Reading the drawings wrong, or working from an old revision
- Laying out from a neighbour's fence or a guess instead of the legal pins
- Not re-checking after weather or machine movement
What the inspector or surveyor checks
- Footprint dimensions match the drawings
- Footing elevation is correct
- Wall thickness and alignment
- Elevations are consistent across the site
- Setbacks to the property lines
Protect the benchmark, then re-check your elevations after the dig, after rain and frost, and after heavy equipment moves around. Write the benchmark elevation on a stake and also on a nearby fixed object, and take a photo. When something looks off, the first question is always: did the reference move?
Rain washes out marks. Frost shifts stakes and elevations. Heat makes string lines sag and lasers shimmer. Wind moves stakes and strings. Re-check after major weather.
The drawings give a 9 m × 12 m footprint. What must each diagonal measure to be square?
The two diagonals read 15.00 m and 15.03 m. What do you do?
A pin looks bumped by the excavator. Do you use it?
Why set batter boards instead of leaving the corner stakes in?
You moved the laser to a new spot. What must you do before reading rods?
Your laser reads 5 mm different over 29 m. Is that fine?
- Nice to haveLevelling:
- Must-haveLevelling: a grade rod and a 4 ft (1.2 m) level
- Must-haveMeasuring:
- Must-haveMarking:
- Must-haveBatter boards and stakes:
- Must-haveLong-distance squaring: two long tapes for diagonals
- Rent itA total station, which is used on commercial and civil layout
- Must-haveHard hat (CSA Z94.1), safety glasses (CSA Z94.3), green-triangle boots (CSA Z195) and gloves
Home DIY
Laborer or helper
1st-year apprentice
Apprentice, 2nd to 4th year
Journeyperson
Lead hand or foreman
Contractor or business owner
Starting a new business
Setbacks, survey certificates and flood construction levels come from local zoning and building bylaws, not from the building code. The footing inspection that checks your layout is a standard stop where inspection stages were verified (BC, SK, ON, NB, NS, PE and Whitehorse). Elsewhere, ask your local authority.
- BC: local governments set permits and inspections. Survey certificate rules vary, so ask your building department.
- SK: Saskatoon has a footing inspection after the pour and stripping. Regina has a foundation inspection after rebar and before pouring.
- ON: notify the chief building official when ready to construct footings, and at substantial completion of footings and foundations before backfilling.
- NB, NS, PE: footings and foundations are inspected before backfilling. PE needs 3 days notice. NL: municipal rules apply to houses.
- YT: Whitehorse requires a foundation and under-slab inspection before backfill. NWT and Nunavut: ask the local authority.
- AB, MB, QC: ask the local authority about survey and inspection requirements.
See Permits and Approvals for the stops, and Canada by Province for the comparison.
- Quikrete, Layout basics for slabs and footers (batter boards, 3-4-5, diagonals, string lines)
- NPTEL, Two-peg test (the principle, for a surveyor's level; the laser version above follows the same logic)
- Diagonal and 3-4-5 arithmetic is the Pythagorean theorem, calculated and re-checked.
- Setbacks, survey certificates and flood levels: your local zoning and building bylaws. Inspection stops: see Permits and Approvals.