Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

Anchors, embeds and dowels that connect concrete to steel columns, beams and plates, and how to keep them exactly where the drawings put them.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isAnchors, embeds and dowels that connect concrete to steel columns, beams and plates.
Your jobPut them in the right place and keep them there. Steel crews do the rest.
The hard ruleNever bend, heat, cut or re-drill a bad bolt. The engineer approves any field fix in writing.
The checkTemplate, equal diagonals, projection, threads covered, photos before the pour.

By the end you can

  • Name the types of tie-ins: anchors, base plates, embeds, dowels, shear studs and column ties.
  • Set and check an anchor bolt template, including the diagonals.
  • Work out a projection and why threads must be protected.
  • Brace and pour around steel without moving it.
  • Know when to stop and send a bolt to the engineer.
Stop and read

Steel is erected and welded by trained crews under their own rules. Your job is to put the anchors and embeds in the right place and keep them there. Do not bend, heat, cut or re-drill a bolt that is in the wrong place. A field fix needs the engineer's written approval, because it can weaken the connection. Fall protection is required at heights of 3 m (10 ft) or more in BC, and similar rules apply elsewhere.

The big idea

Tie-ins connect concrete to steel columns, beams, plates and frames, and pass the loads between them. Most are set during the concrete work and cannot be changed afterward, so a bolt that is 10 mm (3/8 in) out can mean a delay of days and a visit from the engineer. Accuracy matters more here than almost anywhere else on the job.

Steel connections to concrete are engineered. Steel design follows CSA S16, and welding must be done by a firm and welders certified to CSA W47.1 and W59. Anchor and embed details come from the structural drawings.

Types of tie-ins

A square column footing form with a rebar mat on chairs. A plywood template rests across the top of the form and holds four anchor rods hanging plumb, each with a washer and nut on top of the template only. The hooked ends hang inside the form, clear of the rebar.
Anchor rods hung from a template. The template rests on the form and holds the rods at the exact spacing and plumb. The washer and nut sit on top of the template only, and nothing is under it. Projection above the concrete and embedment below come from the drawings. A bolt that is out of place is corrected only with the engineer's approval. Not to scale.
  • Anchor bolts and rods: cast in concrete to hold columns and base plates.
  • Base plates: steel plates bolted to the concrete, usually set on grout.
  • Embed plates: plates cast into walls or slabs, with studs or bars, for welding steel on later.
  • Dowels: bars that connect concrete to concrete or to a steel element.
  • Shear studs: studs welded to beams for composite slabs.
  • Column ties: steel cages or anchors that connect concrete to columns.

Anchor bolt installation

Anchor bolts must land exactly where the drawings put them. A few millimetres can stop the steel from fitting.

  1. Use a template. Made for the job, to hold the bolts at the right spacing.
  2. Fix the template. To the forms or the rebar, so it cannot move.
  3. Check spacing, projection and orientation. Against the drawings.
  4. Check the layout. Against gridlines or survey points before the pour.
  5. Protect the threads. Keep them clean and covered so concrete cannot foul them.
  6. Check again during the pour. Bolts can shift when concrete hits them.

Check the group with diagonals

A rectangular bolt group works like a small building. Example: four bolts at 200 mm × 300 mm (8 in × 12 in). The diagonal is √(200² + 300²) = 360.6 mm (14 7/16 in), and both diagonals must read the same. If they do not, the group is out of square, so find the bolt that moved.

Projection

The bolt must stand high enough to pass through everything it holds, and show thread beyond the nut. Example with made-up numbers: grout 25 mm + plate 20 mm + washer 4 mm + nut 25 mm = 74 mm (2 15/16 in), plus the thread the drawing requires past the nut. The drawing gives the real number.

Tolerances

Anchor bolt tolerances are set by the structural drawings and the steel fabricator and erector, and Canadian practice refers to the CISC Code of Standard Practice for Structural Steel. I could not open the CISC text. For scale only, a US position statement cites the AISC Code of Standard Practice for no more than 1/8 in (3.2 mm) variation between the centres of two anchor rods in a group, and ACI 117 for plus or minus 1/2 in (12.7 mm) on projection. These are US documents and not a Canadian rule. Get the allowed tolerance in writing before the pour, and have the surveyor check the bolts before the steel arrives.

Embed plates

  • Set at the face or depth shown on the drawings.
  • Fix them firmly so they cannot move or tip.
  • Keep the welding face clean and free of concrete.
  • Check location against the structural drawings and the surveyor's marks.
  • Studs or bars welded to the back of the plate transfer the load into the concrete.

Column tie-ins and shear connectors

  • Place the rebar cage around the column base as drawn.
  • Tie dowels from the footing to the column encasement.
  • Keep the required cover around the steel.
  • Plumb and brace the column before forming around it.
  • Shear studs are welded to the beam by a certified welder before the deck or form goes on. Keep them clean and at the spacing drawn, and keep the required slab thickness over them.

Rebar and steel together

  • Do not let rebar touch steel unless the design says so. They are different metals with different roles.
  • Keep cover between the rebar and the steel surface.
  • Use hooks or bends where the drawings call for them.

Forming and pouring around steel

  • Cut forms tight around columns and plates, and seal gaps so grout and concrete cannot leak.
  • Brace more heavily, because steel creates uneven pressure.
  • Check plumb and alignment before the pour.
  • Watch bolts and plates for movement during the pour, and check the projection height.
  • Vibrate carefully near embeds so they do not shift.
  • Make sure concrete fully surrounds the anchors and embeds.

Common mistakes

  • Bolts out of line or out of plumb
  • Embed plates set too deep or too high
  • Bolts shifting during the pour
  • Not enough bracing
  • Rebar touching steel
  • Wrong projection height
  • Trying to fix a bad bolt in the field without approval
Pro note

Steel cannot adjust to the concrete, so the concrete has to be right. Use a template, check the grid, check projection, and check again after the pour. Photograph the layout before you cover it.

Weather note

Steel expands in sun and contracts in cold, which can shift measurements a little over long runs. Rain can rust plates and bolts before the pour, so protect them. Cold concrete sets slowly, which gives bolts more time to be nudged.

What the inspector and engineer look at

Bolt spacing, projection, embed location and condition, rebar cover and alignment. On engineered jobs, the engineer or a testing agency may inspect the layout and the welds. Any deviation is corrected before the pour.

✅ Check yourselfTap a question
An anchor bolt group is a rectangle 200 mm × 300 mm (8 in × 12 in). What should each diagonal measure?
√(200² + 300²) = √130,000 = 360.6 mm. In inches, √(8² + 12²) = 14.42 in, about 14 7/16 in. Both diagonals should read the same. Check the template, then the bolts.
You find one bolt 15 mm (5/8 in) out of place the morning of the pour. What do you do?
Do not bend, heat or re-drill it. Fix the template or the bolt position before the pour, and if it is already cast, take it to the engineer. A field fix needs the engineer's written approval.
The drawings give a projection but the grout, plate, washer and nut add up to more. What is the risk?
The bolt may not reach through the nut with thread showing. Work the total from the drawing: grout + plate + washer + nut + the thread the drawing requires. Ask the engineer if it does not add up.
Why cover the threads before the pour?
Concrete or grout on the threads can stop the nut from running, and cleaning them afterwards can damage the thread. Tape, caps or plastic sleeves keep them clean.
May rebar touch the anchor bolt or embed plate?
Not unless the design says so. Keep cover between rebar and the steel surface.
At what height does BC require fall protection, and when is a written plan required?
Fall protection where a fall of 3 m (10 ft) or more may occur (OHS Reg. 11.2), and a written plan where there are no permanent guardrails and a fall of 7.5 m (25 ft) or more may occur (11.3). Check your own province.
🧰 Gear for this stepMust-haveRent itNice to have
  • Rent itLayout by survey: a total station or transit with a rod
  • Must-haveLayout by hand:
  • Must-haveAnchor bolt templates:
  • Must-haveThread protection:
  • Must-haveEmbeds:
  • Must-haveForming around steel:
  • Must-haveChecking and recording: a tape, a camera for photos before the pour, and the structural drawings on site
  • Rent itAn internal vibrator, used with care so bolts and embeds do not shift
  • Must-havePPE: hard hat (CSA Z94.1), safety glasses (CSA Z94.3), green-triangle boots (CSA Z195), gloves and hearing protection, plus CSA Z259 fall arrest where work is at 3 m (10 ft) or more
👷 Who can do thisTap your level
Home DIY
This is not a DIY job. A home owner should not set anchors or embeds that carry steel columns or beams. Engineered steel needs drawings, an engineer's review, certified welders and often a permit. A DIYer can help with cleanup but not placement or any fix of a bad bolt.
Laborer or helper
Keep clear of anchor bolts and embeds once they are set. Carry material, clean forms and cap threads as directed. Never move, bend or straighten a bolt. Tell your lead right away if a bolt looks bumped or out of place.
1st-year apprentice
You can help set templates, tie rebar around anchors, and brace and seal forms under supervision. Learn to read anchor layouts and to leave a bolt that is wrong alone.
Apprentice, 2nd to 4th year
Build templates, tie rebar around anchors and brace forms from the drawings, under a journeyperson. Measure every bolt against the drawing and report any miss. You do not approve placement, and you never heat, bend or re-drill a bad bolt. That goes to the engineer.
Journeyperson
You own anchor and embed placement against the drawings, bracing and the check before the pour. Stop-work trigger: any bolt or embed outside the tolerance on the drawings, which goes to the engineer. Protect threads during the pour.
Lead hand or foreman
Make the anchor check a recorded step before every pour: each bolt and embed measured against the drawings. Enforce the stop-work trigger and send any out-of-tolerance item to the engineer. Do not approve a field fix yourself or override the engineer.
Contractor or business owner
Price survey checks, templates, extra bracing and engineer review time. Document tolerances in writing, with photos and approvals. Subcontract steel erection and welding to certified firms. A misplaced anchor can delay the whole job, so ask your lawyer or insurer who carries that cost.
Starting a new business
Learn to read steel anchor drawings before you bid, and book the engineer's review into your schedule. Subcontract steel erection and welding to certified firms. Ask your provincial workers' compensation board about coverage, and your insurer and lawyer how a misplaced anchor is covered.
By Province:

The CSA standards (S16 steel design, W47.1 and W59 welding, A23.1 concrete) are national. What changes is the provincial code edition and the OHS fall protection rules during erection.

  • BC: fall protection is required where a fall of 3 m (10 ft) or more may occur (OHS Reg. 11.2), and a written plan where there are no permanent guardrails and a fall of 7.5 m (25 ft) or more may occur (11.3). Structural design is under the BC Building Code, Part 4.
  • Everywhere else: check your provincial OHS regulation for the fall protection trigger height, and the provincial code and your engineer for the structural design requirements.

See Canada by Province for the full comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.

Scroll to Top