Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

The first excavation tool is the locate. After that, match the tool to the soil.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isThe tools and machines that cut, move and shape soil for footings, trenches, drains and repairs.
Your jobLocate buried services first, then match the tool to the soil, the depth, the space and the weather.
The hard ruleNo digging before the locate is done. No entry into a trench over 1.2 m (4 ft) until the sides are safe.
The checkMarks read and visible, spoil back from the edge, a way out, no machines near the edge.

By the end you can

  • Name the locate steps before any digging.
  • Match a tool to a soil type.
  • Choose hand, power or machine for the job.
  • Spot the hazards of fuel, cords, hydraulics and cold.
Stop and read

Hit a gas line, a power cable or a water main and people die. Request locates through your provincial one-call service and allow the time they take. Private lines such as septic, power to outbuildings and water to a shed are often not marked, so use a private locator. Hand-dig or vacuum-expose near the marks and keep the marks visible.

A trench wall can fail without warning. Treat 1.2 m (4 ft) as your own no-entry line until a qualified person has sloped or supported the sides, and keep spoil, machines and loads back from the edge (see Trench Safety).

The big idea

Excavation tools cut, move and shape soil. The right one depends on the soil, the depth, the space you have and the weather. The first tool is not a shovel. It is the locate.

Five numbered steps with small ground cross-sections: call or click your one-call before you dig, wait for the utility responses and marks, read the marks and paperwork, expose the lines by hand or vacuum near the marks, then dig with the right tool while keeping the marks visible.
Call before you dig. Call or click, wait for the marks, read them, expose by hand or vacuum near the marks, then dig with the right tool and keep the marks visible. Private lines are often not marked, so use a private locator. Flag and paint colours in the picture are only illustrative; your locate service explains its own colour code. Confirm the steps and distances with your locate service.

Call before you dig

Start with your province's one-call centre. The Permits lesson lists lead times checked in October 2026, for example BC 1 Call at three full business days (1-800-474-6886) and Alberta One-Call at three full business days (1-800-242-3447). Take the number from the current official page before you call.

  • Locate requests are free in the provinces I checked, but private lines on your property are not covered.
  • Never probe for buried gas or electrical lines with pointed tools. Hand-dig or vacuum-expose within the utility owner's required distance.
  • Excavation rules, including when sloping, benching or shoring is needed, spoil setbacks and the way out, come from your provincial OHS regulation (BC Part 20; see Trench Safety and By Province).

Match the tool to the soil

SoilWhat it is likeTools that work
ClayDense and stickyPick, mattock, round-point shovel
SandLoose; it slumps, so watch the sidesScoop or square shovel
LoamBalancedMost shovels
HardpanVery hard and compactedDigging bar or breaker
Rocky soilStones and bouldersMattock, bar, power breaker
Frozen soilHard now, but can thaw and slumpPick, ice chisel, demolition hammer
MudWet banks collapseMud shovel and a pump
Compacted fillHard and layeredPick, rammer, breaker

Frozen ground is not a sign of a stable bank. See Soil Types for how to read the soil you have.

Hand tools

  • Round-point shovel: curved blade for breaking and lifting soil.
  • Square shovel: flat blade for shaping and cleaning edges.
  • Trench (drain) spade: narrow blade for narrow, deeper trenches.
  • Spade: clean vertical edges and sod.
  • Scoop shovel: loose soil, sand and gravel.
  • Pick and mattock: break hard ground and chop roots.
  • Digging bar: breaks rock, hardpan and frost.
  • Post-hole digger and earth auger: narrow, deep holes.
  • Hand tamper: small-area compaction (see Compaction Tools).

Power tools and machines

  • Demolition hammer or breaker: breaks concrete, rock and hardpan. Heavy, loud and a silica hazard on concrete.
  • Rotary hammer: drills holes for stakes, pins and anchors.
  • Compact or walk-behind trencher: narrow trenches for drains and services.
  • Mini-excavator: footings, trenches and tight access. Mid-size excavator: deep trenches and large digs.
  • Skid steer or track loader: moving spoil, grading and backfill; tracks help in mud. Backhoe: digs and loads in one machine. Compact dozer: grading.
  • Dump trailer or truck: haul spoil away; check weight limits and cover loads.

Example (numbers made up). A footing trench 12 m (39 ft 4 in) long, 0.6 m (2 ft) wide and 0.5 m (1 ft 8 in) deep is 12 × 0.6 × 0.5 = 3.6 m³ (4.7 yd³) in place. Soil swells once dug, so plan a bigger spoil pile and bigger trailer than that.

Measuring, layout and power sources

  • Layout: tape measures and long tapes, laser and builder's levels, grade rods, string lines, line pins, stakes and flags, and marking paint (use the standard colours for buried services where you mark them).
  • Manual: no fuel and no cord. Cold stiffens your hands.
  • Corded electric: use ground-fault protection (GFCI) on the supply and on extension cords, especially in wet conditions or in a trench. Confirm your provincial OHS electrical rules.
  • Battery: portable and quiet, but batteries lose power in cold and can overheat in hot sun.
  • Gas and diesel: high power but they give off carbon monoxide, so never run them in a trench, enclosure or low area without ventilation.
  • Compressed air: compressors struggle in freezing weather and moisture in air lines can freeze.
  • Hydraulic (machines): never check for leaks with your hand, because high-pressure fluid can inject through skin.

Weather and safety gear

  • Hot: water, shade and sun protection.
  • Cold: insulated handles, ice chisels, warm storage for batteries.
  • Wet: mud-rated boots, trench pumps, GFCI on everything electric.
  • Snow and ice: traction cleats and de-icing.
  • Wind: dust masks and sealed glasses.

PPE for this work: hard hat, green-triangle safety boots, safety glasses, hearing protection around breakers and machines, cut-resistant gloves, hi-vis vest, and a respirator when breaking concrete or in dusty ground. See Safety Gear for standards and fit.

Common mistakes

  • Digging before the locate is done
  • Wrong tool for the soil
  • Skipping layout
  • Over-digging below the footing level
  • Unsafe trench sides
  • Spoil piled at the edge
  • Working in an excavation with machinery moving nearby
Pro note

Excavation is fastest when the tool matches the soil, the depth and the weather. Plan the layout, the elevations, where the spoil goes and the safe edge before the first cut.

Weather note

Rain turns clay to grease and sand to soup. Frost gives a false sense of strength. Hot, dry soil dusts and can slump when it is cut. Re-check the sides after rain, thaw or heavy loads.

What the inspector looks at

Whether the locate was done, the depth and width against the plan, the sides and spoil setback, and the bottom of the excavation before footings go in. Confirm what your authority checks.

✅ Check yourselfTap a question
What is the first tool for any excavation?
The locate. Call or click your provincial one-call service, wait for the marks and read them before you dig.
How much notice does BC 1 Call ask for, according to the Permits page?
Three full business days (checked October 2026 against official pages; confirm the current number before you call).
Does a locate request find a private septic line or power to an outbuilding?
No. Private lines on the property are not covered, so use a private locator and hand-dig or vacuum-expose near any suspected line.
What is your own no-entry line for a trench, anywhere in Canada?
1.2 m (4 ft). Nobody goes in until a qualified person has sloped, benched or supported the sides. Alberta and Manitoba put the regulation trigger at 1.5 m (5 ft), but 1.2 m is the safe habit (see Trench Safety).
A footing trench is 12 m (39 ft 4 in) long, 0.6 m (2 ft) wide and 0.5 m (1 ft 8 in) deep. How much soil comes out?
12 × 0.6 × 0.5 = 3.6 m³ (4.7 yd³) in place, and it will swell once dug, so plan for more spoil. The size is made up.
Why must you never run a gas or diesel machine in a trench?
They give off carbon monoxide, which collects in low areas and enclosed spaces.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveHand tools:
  • Must-haveLayout:
  • Rent itBreaking and drilling: demolition hammer or breaker and a rotary hammer, with dust control
  • Rent itMachines:
  • Must-haveLocating: a private utility locator for lines the one-call service does not cover
  • Rent itWater control: trench pump and hoses where the ground is wet
  • Must-haveElectrical:
  • Must-havePPE: hard hat (CSA Z94.1), safety glasses (CSA Z94.3), green-triangle safety boots (CSA Z195), cut-resistant gloves, hi-vis vest, hearing protection near breakers and machines; respirator (CSA Z94.4) when breaking concrete or in dusty ground
🛒 Buy, rent or borrow?Tap your level
Home DIY
A capable owner can dig a shallow hole or trench with hand tools after the locate is done and the marks are read. Do not enter any trench or hole deeper than 1.2 m (4 ft) unless a qualified person has sloped or supported the sides, and do not run machinery near marks without the locate. Hire an operator for an excavator.
Laborer or helper
Dig with hand tools where the lead tells you, keep spoil back from the edge, and keep clear of machines. Never enter a trench the lead has not cleared. Report cracks, slumping or water in the sides at once.
1st-year apprentice
Use hand tools and a compact breaker under supervision, set up layout, and keep marks visible. Learn the locate steps, soil types and why spoil sits back from the edge.
Apprentice, 2nd to 4th year
Run hand and power tools, check depth against layout, and expose lines by hand or vacuum near the marks. Do not run machinery until you are trained and authorised. Report any unmarked line or surprise.
Journeyperson
You own the locate, tool choice, layout and the safe edge. Stop the dig if marks are missing or unclear, an unmarked line turns up, or the sides show cracks or water. Know who the qualified person is and what the regulation requires.
Lead hand or foreman
Confirm locates are done and marks are read before anyone digs, check spoil setbacks and exits, and make sure operators are trained. Stop work if the ground or the paperwork does not match the plan.
Contractor or business owner
Price locates, a private locator, vacuum or hand exposure, spoil removal and the right machine for the soil. Keep locate paperwork and daily checks on file, and ask your insurer who carries the risk of a utility strike.
Starting a new business
Learn your province's excavation rules, locate service and training requirements before you quote. Keep locate numbers and dates on every job, and ask your insurer about utility strikes and workers' compensation coverage.
By Province:

Locate services, notice periods and excavation trigger depths differ by province. The Permits lesson lists the one-call services, and Trench Safety lists the trigger depths (1.2 m in most provinces, 1.5 m in Alberta and Manitoba). I dropped the old exposure limits and other per-province figures because I could not verify them here. Confirm with your OHS regulator and one-call service.

See Canada by Province for the full comparison.

Sources:
  • Locate lead times and trench trigger depths come from the Permits and Trench Safety lessons in this book, which cite official and regulator pages (checked October 2026).
  • Tool and soil guidance is general trade practice, not a code citation. Fuel, electrical and hydraulic hazards are general safety practice; confirm your provincial OHS rules.

Last reviewed October 2026. General information, not engineering or legal advice.