Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

An epoxy anchor is only as good as the hole, the cleaning and the cure. Follow the maker exactly.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isA threaded rod glued into a drilled hole in hardened concrete with two-part structural epoxy.
Your jobDrill, clean, inject and set the rod exactly as the product's printed instructions say, then let it cure.
The hard ruleOnly an approved product, chosen by the engineer, installed to the maker's instructions. Never load it before it cures.
The checkProduct approval, hole size, depth, cleaning, temperature, cure time and photos.

By the end you can

  • Say what an epoxy anchor is and when it is used.
  • Follow the install sequence: drill, clean, inject, set, cure.
  • Explain why the maker's instructions and hole cleaning matter.
  • Name the hazards of drilling concrete and handling epoxy.
Stop and read

Drilling concrete makes silica dust, which causes lung disease. Use a rotary hammer with dust extraction or water and a respirator suited to the job, and check your provincial OHS regulator's silica rules. Rotary hammers can kick back, so use the side handle and wear hearing and eye protection. Scan for rebar before you drill, and do not cut it unless the engineer allows it.

Epoxy is a hazardous product. It can cause skin and eye damage and allergic reactions. Read the safety data sheet, wear gloves and eye protection, and keep it off your skin. Wear eye protection overhead, where epoxy can run or drip.

Structural work is not guesswork. If the drawings give a number, the drawings win. Ask the engineer if you are not sure.

The big idea

An epoxy anchor is a threaded rod glued into a drilled hole in hardened concrete. It is used to fix a missed or misplaced cast-in bolt, add hold-downs, and make retrofits. It works only as well as the installation: the hole, the cleaning, the injection and the cure. A Structure magazine article notes that adhesive sensitivity can be influenced by mixing, hole cleaning and moisture, so one bad step weakens the whole anchor.

Six small drawings in two rows show installing an epoxy anchor in a concrete hole: drill, brush, blow out the dust, repeat the brush and blow, inject epoxy from the bottom while backing out slowly, and insert the rod with a twist.
Epoxy anchor installation sequence. Drill, brush, blow, repeat the cleaning, inject from the bottom and insert the rod. The product's own instructions control the number of cleaning cycles, the fill and the cure time.

What the standards say

Adhesive anchors are not a Part 9 prescriptive item. They are chosen and designed by an engineer. What I could source:

  • A Hilti Canada engineering article says that, for post-installed anchors tested to ACI 355.2 and ACI 355.4, design information under the Canadian concrete standard (CSA A23.3-19, Section D.10.2.2) is taken from a product evaluation report. ICC-ES reports are based on testing to the AC308 criteria, which reflect ACI 355.4.
  • The same article says to follow the manufacturer's printed installation instructions for cure times, working times and hole-cleaning methods, and recommends installer training on them.
  • Structure magazine says hole cleaning has a significant impact on performance, typically blow, brush with a steel wire brush, then blow again, with requirements that vary by system. Cure rate depends strongly on temperature: common installation ranges are 41 to 104 °F (5 to 40 °C), some products are tested down to 14 °F (−10 °C), and a 24-hour cure rule of thumb may not be enough for some products. Its inspection rules for sustained overhead loads come from the US IBC, not a Canadian code.

Both sources are manufacturer or US-trade articles, so treat them as secondary. I did not verify CCMC evaluation requirements, provincial silica rules or proof-load testing rules.

Components

  • Threaded rod (galvanized or stainless, as specified)
  • Two-part structural epoxy in an approved cartridge
  • Rotary hammer with the right bit
  • Wire brush and blow-out tool (oil-free compressed air or a hand pump)
  • Dispensing gun and mixing nozzle

Installing the anchor

  1. Check. Confirm the product is the approved one, the concrete is old enough and within the product's temperature range, and scan for rebar.
  2. Drill. Use the bit size and depth from the product instructions or the engineer. Drill straight, and keep away from rebar and edges by the distance the design gives.
  3. Clean. Blow, brush, then blow again for the number of cycles the product requires, with a brush that fits the hole and clean, oil-free air. Keep dust and water out until you inject.
  4. Inject. Discard the first bit of epoxy from each new nozzle until it is an even colour. Start at the bottom and back out slowly so you do not trap air. Fill the amount the maker states.
  5. Set the rod. Push the rod in with a twisting motion to the marked depth and check epoxy comes up around it.
  6. Cure. Do not disturb, load or tighten until cured. Cure time depends on concrete temperature, so use the maker's chart.

Example (numbers made up). A hole 150 mm (5 7/8 in) deep for each of 8 hold-down rods is 8 × 150 = 1,200 mm (3 ft 11 1/4 in) of drilling in total. Hole size, depth and cure come from the product sheet.

Common mistakes

  • Poor hole cleaning
  • Wrong hole size or depth
  • Too little epoxy
  • Rod disturbed during cure
  • Non-approved epoxy
  • Tightening before cure
  • Hitting rebar
Pro note

Photograph each hole, its cleaning and the product batch. If an inspector or engineer asks later, you will be glad you did.

Weather note

Cold slows the cure a lot and wet holes spoil the bond. Hot weather shortens working time. Check the product's temperature limits before you start.

What the inspector looks at

Product approval, hole size, depth, cleaning, cure time and sometimes proof-load tests, as the engineer requires.

✅ Check yourselfTap a question
What is an epoxy (adhesive) anchor?
A threaded rod glued into a drilled hole in hardened concrete with a two-part adhesive. It is used for retrofits and fixing missed or misplaced cast-in bolts.
What controls the cure time, the hole-cleaning method and the working time?
The manufacturer's printed installation instructions for that product (a Hilti Canada engineering article calls them the MPII). Do not use another product's steps.
Where does design information for a tested adhesive anchor come from in the Canadian concrete code?
From a product evaluation report, according to a Hilti Canada article citing CSA A23.3-19 Section D.10.2.2. The engineer chooses and designs the anchor.
Why does hole cleaning matter so much?
A Structure magazine article says properly cleaning the hole can have a significant impact on adhesive anchor performance. Dust or water in the hole weakens the bond.
A 16 mm hole is drilled 0.15 m deep. How deep is that in inches?
0.15 m = 150 mm, about 5 7/8 in. Sizes are made up; the real hole size and depth come from the product instructions or the engineer.
Can you tighten the nut as soon as the rod is in?
No. Wait for the full cure time for the concrete temperature. A 24-hour rule of thumb is common but may not be enough for some products.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveLayout and measuring:
  • Rent itDrilling:
  • Must-haveHole cleaning:
  • Must-haveInjection:
  • Must-haveHardware:
  • Must-haveRecords:
  • Must-havePPE: hard hat (CSA Z94.1), eye protection (Z94.3), green-triangle safety footwear (Z195), chemical-resistant gloves, hearing protection; respirator (Z94.4) suited to silica dust when drilling
👷 Who can do thisTap your level
Home DIY
Do not install structural epoxy anchors yourself. A capable owner can help with layout, cleaning up and holding the dust extractor, and can do a non-structural fix such as a fence post bracket from the product's own instructions. Anything that carries the building (hold-downs, ledgers, retrofits) is the engineer's design and a trained installer's job. Never drill concrete without dust control.
Laborer or helper
Carry cartridges, hold the dust extractor, clean up and keep clear of the drilling. Do not mix, inject or set rods on your own. Tell the lead if a hole looks dirty, wet or the wrong size.
1st-year apprentice
Drill, clean and inject under supervision. Learn the maker's printed installation instructions and why hole cleaning is the step that most often goes wrong.
Apprentice, 2nd to 4th year
Drill, clean and inject as the product instructions say, with a partner checking each step. Keep the batch numbers and photos. Never tighten a rod before the cure time has passed.
Journeyperson
You own hole size and depth, the cleaning sequence, injection, cure and records. Stop work if the concrete is outside the product's temperature range, the hole is wet, or you hit rebar. Call the engineer rather than improvising.
Lead hand or foreman
Check the product approval against the drawings, watch the first hole of each set, and make sure photos and batch records exist. Make sure the inspector or engineer sees any proof loading they require.
Contractor or business owner
Price rental drilling gear, dust control, cartridges and extra inspection or proof-load tests. Keep the product approval and installer training on file, and ask your insurer who carries the risk of a failed anchor.
Starting a new business
Know the engineer's design basis, the product's evaluation report and the maker's instructions. Keep the training and inspection record, and ask your lawyer or insurer about structural liability.
By Province:

Each province adopts its own edition of the codes and has its own OHS regulator for silica, respirators and hazardous products (WHMIS). I dropped the old per-province list because I could not verify it. Confirm with your building department, the engineer and your OHS regulator.

See Canada by Province for the full comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.