Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

Backfill goes in thin layers, and each one is compacted before the next. Thin lifts feel slow and save the most money.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isPlacing backfill in thin layers (lifts) and compacting each one before the next goes on.
Your jobHold the lift thickness, keep the moisture right, hand-tamp near the wall, and keep heavy machines back.
The hard ruleNever compact wet, frozen or spongy fill, and never run a heavy compactor against a wall that is not designed for it.
The checkLift depth measured, no soft spots, and a density test on anything that will carry slabs, walks or footings.

By the end you can

  • Explain why backfill goes in lifts, and who sets the thickness.
  • Measure and hold a lift depth on site.
  • Compact near a wall without loading it.
  • Spot poor compaction before it shows up as settlement.
Stop and read

Do not compact against a wall that is not supported at the top. Wait for the floor system, or the bracing your designer set, before backfilling. Bring both sides of the wall up evenly where you can, and keep heavy compaction back from the wall by the distance the designer approves.

Rammers and plates are loud and shake the operator's hands and arms, so wear hearing protection. Never run a petrol machine in a trench, because exhaust gas collects in the hole. Never enter a hole 1.2 m (4 ft) or deeper unless it is sloped, shored or boxed.

The big idea

Backfill goes in layers, and every lift is compacted before the next goes on. Dump it all at once and the bottom stays loose, then settles for years. That is how driveways crack and patios tilt. Thin lifts feel slow, and they save the most money.

A cross-section of a foundation wall with the floor system already in place. Backfill is built up in four numbered lifts. A strip along the wall gets only light hand tamping. Farther out a plate compactor works the top lift.
Backfill in lifts. The floor system goes in first. Each lift is compacted before the next is placed, only light tamping is used beside the wall, and the plate compactor works farther out. Not to scale. Four lifts are drawn for clarity, and a real wall needs more. Thickness per lift: follow the spec and the machine maker.

How thick is a lift?

There is no single number. The Part 9 text I read gives no lift thickness or compaction level (Section 9.12 only says to place backfill so it does not damage the wall, drain or dampproofing, and to grade it away from the foundation). The number comes from your drawings, the geotechnical report, the designer or the building official. Here is what the sources I could read say, as examples:

SourceWhat it saysNotes
Builder magazine, "How to Backfill a Foundation" (2012, US)Layers 6 to 12 in (150 to 300 mm), each compacted as placed. A hand-operated jumping-jack compactor is the best practice it names.One trade article, not a code or spec.
City of Winnipeg Standard Construction Specification, Section 31 00 99 Earthwork (August 2017 project copy)150 mm (6 in) lifts for all materials. 95% density to ASTM D698. Notify the contract administrator 48 hours before backfilling so tests can be done.Written for one masonry restoration project. It names "Modified Proctor" while citing D698, a standard-effort test, so the basis is unclear.
Town of Leader, Saskatchewan, Soil Compaction Policy (adopted September 2025)150 mm (6 in) lifts at the trench bottom, bedding and pipe zone. 300 mm (12 in) lifts in the backfill zone above the pipe. 95% standard Proctor density. Moisture within 3% of optimum before the next lift.For utility backfill under public roads, not for house foundations.

Two things hold across the examples: thin lifts, and a test to prove the result. I did not find a plate-compactor maker's published lift limit, so use the manual for your machine, and keep the lift thinner than the maker's maximum next to a wall.

Example (numbers made up). A 2.4 m (7 ft 10 in) deep backfill placed in 150 mm (6 in) lifts takes 2.4 ÷ 0.15 = 16 lifts. In 300 mm (12 in) lifts it would take 8. Each 150 mm lift of a 0.6 m (2 ft) wide granular zone along a 36 m (118 ft 1 in) wall is 0.6 × 36 × 0.15 = 3.24 m³ (4.2 yd³) loose, and 16 lifts total 51.84 m³ (67.8 yd³).

Moisture and weather

  • Granular fill compacts best slightly damp. Too wet leaves a spongy fill, and too dry will not bind. One municipal policy asks for moisture within 3% of optimum before the next lift, which needs a test to know.
  • Do not use frozen material or place fill on frozen surfaces. The same policy says so, and it is why spring settlement happens.
  • Do not compact saturated fill. Cover the work at the end of the day so the next morning's lift starts on a good base.

Near the wall

  • Keep the wall supported at the top until the floor system is on, or follow the designer's bracing (see Backfill Types).
  • Use hand tampers or light equipment close to the wall and the drainage layer, and place fill so the dampproofing, board and drain are not damaged (Part 9, Article 9.12.3.1).
  • Bring up both sides of the wall in matching lifts where there is soil on both sides, to avoid pushing it over. That is general practice, not a code sentence I read.
  • Keep heavy compaction back from the wall by the distance your designer approves. Many walls are not designed for compaction loads.
  • Check the dampproofing, board and pipe for damage as you go.

Equipment

  • Plate compactor: thin lifts of granular fill, and pipe zones. A maker's brochure describes reversible plates as for granular and mixed soil.
  • Jumping jack (rammer): confined trenches and tight spots.
  • Vibratory roller: large open areas, at the lift the machine maker allows.
  • Excavator bucket: not a compactor. Tamping with a bucket compacts only the surface.

Match the machine to the soil and the lift, and read the maker's manual.

Signs of poor compaction

  • A settlement trench along the foundation months later.
  • Cracked or sinking patios, walks and driveways.
  • Water collecting beside the house.
  • Soft spots when someone digs there again.

Measure lift depth with a marked shovel handle or grade stick, compact each lift fully before adding the next, and on engineered jobs record the dates, lifts and tests.

Common mistakes

  • One thick lift
  • Heavy compactor against the wall
  • Compacting wet, frozen or spongy fill
  • Using a bucket as a compactor
  • Skipping the test under slabs and walks
  • Copying another job's lift number
Pro note

Thin lifts feel slow and save the most money. A callback for settled concrete costs far more than the extra hours of backfilling properly.

Weather note

Rain, frost and heat all change what compacts. Do not compact wet, frozen or crusted material, and cover the work at day's end.

What the inspector looks at

Where compaction is specified, density test results, and the order and timing of backfill. Confirm what your building department checks.

✅ Check yourselfTap a question
Why not dump all the backfill in at once?
The bottom stays loose and settles for years, so patios and walks crack or tilt. Compact each thin lift before you add the next.
What does the Part 9 text I read say about lift thickness?
Nothing. Section 9.12 says backfill shall be placed to avoid damaging the wall, drain and dampproofing, and shall be graded away from the foundation. Lift thickness and compaction come from your designer, the spec or your building official.
A municipal trench spec says 150 mm (6 in) lifts. Is that your lift thickness for a house wall?
Not automatically. It is one example from a public-works spec. Use the number on your drawings, from the engineer, or from the compactor maker's manual, and keep it thinner next to the wall.
A 2.4 m (7 ft 10 in) backfill is placed in 150 mm (6 in) lifts. How many lifts?
2.4 ÷ 0.15 = 16 lifts. At 300 mm (12 in) it would be 8. The height is made up.
Why keep a heavy compactor away from the wall?
Many walls are not designed for compaction loads. The distance is the designer's call, and the area close to the wall gets light hand tamping.
The fill is frozen lumps and soaking wet. Do you compact it?
No. Frozen fill leaves voids that settle in spring, and saturated fill turns spongy. Wait, replace it, or dry it as the designer allows.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveMeasuring lifts (basics):
  • Nice to haveMeasuring lifts (laser): a laser or long level to keep lifts even
  • Rent itCompaction (machines):
  • Must-haveCompaction (hand): a hand tamper beside the wall
  • Must-haveMoisture:
  • Rent itTesting: a nuclear density gauge or equivalent, run by a testing company, with the report filed
  • Rent itPlacing fill (machine): an excavator or loader
  • Must-havePlacing fill (hand tools):
  • Must-havePPE:
  • Must-haveNoise and vibration: hearing protection (CSA Z94.2) and anti-vibration gloves for rammers and plates. Never run a petrol machine in a trench.
👷 Who can do thisTap your level
Home DIY
A capable owner can place and compact thin lifts of granular fill around a house once the wall is supported at the top. Do not guess on fill under slabs, driveways or footings: get the compaction target from the designer and a test. Treat 1.2 m (4 ft) as a no-entry line, and keep heavy machines away from the wall.
Laborer or helper
Rake fill level, hold the grade stick for lift depth, and stay clear of the machine. Never enter a hole 1.2 m (4 ft) or deeper unless it is sloped, shored or boxed. Tell the lead if the ground feels soft or spongy.
1st-year apprentice
Run a plate compactor or rammer on thin lifts under supervision, and measure lift depth. Learn the moisture rules, and why heavy machines stay back from the wall.
Apprentice, 2nd to 4th year
Measure each lift with a marked shovel or grade stick, then compact it under direction. Keep heavy machines back from the wall. Report wet, frozen or soft fill, because that is a stop sign.
Journeyperson
You own lift depth, moisture, and the order of backfill on both sides of the wall. Stop-work triggers: the fill is wet, frozen or spongy, the wall is not supported at the top, or a soft spot appears. Then call the engineer or order a test.
Lead hand or foreman
Hold the line on lift thickness each day, and walk the fill for soft spots before the next layer. Stop if the fill is wet, frozen or spongy, or the wall is not supported. Order a compaction test or call the engineer rather than guessing a target.
Contractor or business owner
Price compaction testing and the extra time that thin lifts take. Keep dates, lift depths and test reports on engineered jobs. Settled slabs and walks are a common callback, so document the work and follow the designer's spec.
Starting a new business
Learn how compaction is specified and tested before you quote backfill. Subcontract testing, and ask the designer for the target. Ask your insurer who is liable for later settlement, and keep dated lift records as your proof of work.
By Province:

No provincial or national code sentence I read sets a lift thickness for house backfill. It comes from the spec, the geotechnical report, the designer or the building official, and testing is required on engineered fill. What changes by province is the excavation and inspection rules around the job, including how far spoil and equipment must stay back from an excavation edge. I dropped the old per-province setback list because I could not verify it, so check the Trench Safety page and your provincial OHS regulator.

See Canada by Province for the full comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.

Scroll to Top