Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

A sump pumps away foundation drain water when gravity cannot. It is a mechanical system, so plan for failure.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isA pit, a pump and a switch that collect foundation drain water and pump it away when gravity cannot.
Your jobSet the pit at the low point, connect the drain, fit the check valve and discharge, and test the system.
The hard ruleAt least 750 mm (2 ft 5 1/2 in) deep, at least 0.25 m² (2.7 ft²), with an airtight cover (9.14.5.2).
The checkPour water in the pit, and watch the pump start, stop and the check valve hold.

By the end you can

  • Say what Part 9 requires of a sump pit and cover.
  • Choose pump type and work out a rough size from flow and head.
  • Fit a check valve and discharge line that can be serviced.
  • Test and maintain the system, and plan for a power failure.
Stop and read

Pumps run on electricity near water. Leave the wiring to a licensed electrician, who works to the Canadian Electrical Code and your provincial rules. Never handle a pump or cord standing in water. Cutting the slab makes silica dust, so wet-cut or use dust extraction and wear a fit-tested respirator. Keep the pit covered, because an open pit is a fall and child hazard.

The big idea

A sump collects water from the foundation drain and pumps it away when gravity cannot. It is a mechanical system with a pump, a switch and a power supply, so it can fail. Design for that.

A cross-section of a sump pit set into a basement slab. A perimeter drain pipe enters the pit through the side. A pump sits on a base above a gravel and sediment space. A float switch marks the high water level where the pump turns on and the low water level where it turns off. The discharge pipe has a check valve and leaves through an airtight lid.
A sump pit. The perimeter drain flows in at the side. The pump sits low in the pit on a base, with a check valve above it and a discharge line that goes through an airtight lid to an approved location. Not to scale. The inlet pipe is drawn crossing the base of the wall, and in real work it runs under or through the footing as the design shows. Confirm sizes in your provincial code.

What the code says

From Part 9, Section 9.14, as printed in the Vancouver Building Bylaw 2014:

  • The pit is at least 750 mm (2 ft 5 1/2 in) deep and at least 0.25 m² (2.7 ft²) in area (9.14.5.2).
  • It has a cover that resists removal by children and is airtight (9.14.5.2, with 9.25.3.3).
  • Where gravity drainage is not practical, an automatic sump pump discharges to a sewer, a drainage ditch or a dry well (9.14.5.2).
  • Where a stone layer is used instead of pipe, the excavation is graded so the whole layer drains to a sump (9.14.4.3).

A 0.25 m² pit is about 500 mm (20 in) square, or 565 mm (22 1/4 in) round. The text I read sets no pump size, alarm or backup. Those are good practice, so confirm what your province requires.

Electrical and radon

Pump circuits fall under the Canadian Electrical Code and your provincial electrical rules, so hire a licensed electrician and ask what protection your jurisdiction requires. An airtight sump cover also helps keep radon out. Part 9 asks for a sub-slab depressurization rough-in in dwellings (9.13.4.2), with exemptions. Confirm what your province requires.

The pit

  • Set it at the lowest point of the drain system.
  • Size it to the code and the pump maker. A retailer's guide suggests an 18 to 24 in (450 to 600 mm) pit, to reduce short cycling.
  • A liner on a stone base, with a watertight drain connection and a sealed cover.
  • Leave a gravel and sediment space below the pump, so silt does not foul the float.

Pump types

  • Submersible: quiet and efficient, and common in houses.
  • Pedestal: the motor sits above the water, which is easier to service but noisier.
  • Backup pump: battery or water-powered, for power outages.
  • Two pumps: for high water tables or critical basements.

Sizing

Size by flow and head, not by horsepower. A bigger pump is not always better, because an oversized pump short-cycles and wears its switch, and an undersized one runs continuously.

  • Flow: pit volume per cycle times cycles per minute in a storm.
  • Head: the vertical lift from the pit to the highest point of the discharge, plus friction. A retailer's guide uses 1 ft of head per 10 ft of horizontal pipe, plus 1 to 2 ft per pair of elbows. That is a rule of thumb.
  • Pump curve: read the maker's curve at your head, with about 25 percent margin. Box ratings are at zero lift and overstate real flow.

Example. A 560 mm (22 in) pit has 0.25 m² of area. With the float switching on 200 mm (8 in) above where it switches off, each cycle moves 0.25 × 0.2 = 0.05 m³, or 50 L (13 US gal). If it cycles every 2 minutes in a storm, the flow is 25 L/min (6.6 US gal/min), so look for about 31 L/min with a 25 percent margin. With 2.4 m (7 ft 10 in) of lift and 12 m (39 ft 4 in) of horizontal pipe, the head is about 2.4 + 1.2 = 3.6 m (11 ft 10 in). Every number here is made up.

Discharge and check valve

  • Rigid discharge pipe, with a check valve above the pump so water does not run back. One municipal checklist says to confirm there is a check valve on the drain line just above the sump cover.
  • A union or serviceable fitting, so the pump can be removed.
  • Where freezing is a risk, follow the pump maker's advice on a relief hole.
  • The discharge goes to a sewer, ditch or dry well (9.14.5.2). The Discharge Lines page covers where the water goes.

Backup, alarm and maintenance

  • A high-water alarm, and a battery or water-powered backup pump, are good practice. Power outages come with storms.
  • A municipal checklist says to test at least twice a year, preferably before spring thaw. Pour water in the pit and check that the float moves freely, the discharge line does not leak, the alarm sounds and the backup only starts if the primary fails.
  • Clean silt and debris from the pit, because they block the float and clog the impeller.
  • If a ground-fault device is on the circuit, test it too, because it can trip and disable the pump.
  • I did not find a verified service life, so the page gives none. Ask the pump maker.

Common mistakes

  • Pump too small or too big
  • Pit too shallow
  • No check valve
  • No backup
  • Open or loose cover
  • Discharge too close to the house
Pro note

Test the sump before the rainy season. The day it matters is the day the power is out.

Weather note

Heavy rain and snowmelt test the pump. Freezing can block the discharge and burn the pump out. Power outages come with storms.

What the inspector looks at

Pit depth, area, cover, pump, discharge route, check valve, and the electrical.

✅ Check yourselfTap a question
What are the minimum pit size and cover under Part 9?
At least 750 mm (2 ft 5 1/2 in) deep and at least 0.25 m² (2.7 ft²) in area, with a cover that resists removal by children and is airtight (9.14.5.2).
A 560 mm (22 in) round pit has a pump that switches on 200 mm (8 in) above where it switches off. How much water is pumped per cycle?
Area 0.25 m², so 0.25 × 0.2 = 0.05 m³ = 50 L (13 US gal) per cycle. The 200 mm is made up. Your float setting decides it.
If that pump cycles every 2 minutes in a storm, what flow does it need?
50 L ÷ 2 min = 25 L/min (6.6 US gal/min). With a 25 percent margin, look for about 31 L/min at your real head. The cycle time is made up.
A pit is 2.4 m (7 ft 10 in) below the discharge outlet, with 12 m (39 ft 4 in) of horizontal pipe. What is the rough head?
Lift 2.4 m plus friction. A retailer's rule of thumb is 1 ft of head per 10 ft of horizontal pipe, so about 1.2 m (3.9 ft). Total about 3.6 m (11 ft 10 in), and you read the pump curve at that head.
Why a check valve above the pump?
So water in the discharge pipe does not run back into the pit and make the pump cycle again.
What do you test before the rainy season?
Pour water into the pit and watch the pump start and stop, the float move freely, the check valve hold, the discharge line stay dry, the alarm sound, and the backup switch on.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveLayout and measuring: tape measure, marker and a level to set the pit at the lowest point and the cover flush with the slab
  • Rent itPit work (machine): a concrete saw or breaker to open the slab, with wet cutting or dust extraction
  • Must-havePit work (hand tools):
  • Must-havePit and pump:
  • Must-haveDischarge:
  • Rent itElectrical (installer): a circuit installed by a licensed electrician
  • Must-haveElectrical (tester): a multimeter for testing
  • Must-havePPE: hard hat (CSA Z94.1), eye protection (CSA Z94.3), green-triangle boots (CSA Z195), hearing protection (CSA Z94.2), and a respirator (CSA Z94.4) with dust control when cutting concrete because of silica
👷 Who can do thisTap your level
Home DIY
A capable owner can install a pit liner and a plug-in pump with a check valve, and test it. Do not wire the circuit, and do not cut the slab without wet cutting or dust extraction, because silica dust is a health hazard that a dust mask does not control. Electrical work near water needs a licensed electrician and often a permit. Hire a pro if the drain system is part of a waterproofing design.
Laborer or helper
Carry pipe, keep the work area clear, and do the digging around the pit only as directed. Never wire the pump. Do not cut the slab unless you are trained and the cut is wet or has dust extraction. Tell the lead about dust, standing water near a cord, or an unprotected hole.
1st-year apprentice
Under supervision, set the pit, connect pipe and the check valve, and test the pump. Learn first the electrical rules around water, silica dust control, and why a backup is needed.
Apprentice, 2nd to 4th year
Set the liner, connect pipe and test the pump with the journeyperson watching. Wet-cut or use dust extraction on any slab cutting, and leave all wiring to the licensed electrician. Report any water near live cords at once.
Journeyperson
You own the pit location and depth, the drain connection, the discharge route and the check valve. Stop-work triggers: the pit cannot sit at the lowest point of the drain system, the circuit is not installed by a licensed electrician to your code, or the discharge has no approved route. Size the pump against head and flow, and add a second pump or alarm where the water table is high.
Lead hand or foreman
Enforce wet cutting or dust extraction on the slab, and stop the job if the circuit is not installed by a licensed electrician to your code. Run and record a full pump test, and check that the discharge route is approved.
Contractor or business owner
Price the pit, pumps, electrical and a backup, and hire the licensed electrician and plumber your province requires. Document the test and give the owner maintenance notes. A sump is a mechanical system that can fail, so tell the client.
Starting a new business
Plan the sump as a mechanical system: bring in the electrician and plumber early, and ask your insurer about water damage if a pump fails. Confirm permit and discharge approval with your building department. Give the owner a written test record and maintenance notes.
By Province:

The technique is the same across Canada. What changes is the code edition, the plumbing and electrical rules, the discharge rules, and the radon requirement. I read Section 9.14 in the Vancouver Building Bylaw 2014, which may not match your province's current edition. Confirm the clauses and the discharge rules with your local building department and your electrical and plumbing authorities.

See Canada by Province for the full comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.