Exterior flatwork takes frost, salt, water and vehicles. It lives or dies on air entrainment, drainage, joints and curing.
Tap your level and the boxes below open to the advice for you. Remembered on this device.
By the end you can
- Order the right mix for exterior flatwork.
- Set the slope and joint layout before the pour.
- Finish an air-entrained slab without a steel trowel.
- Cure and protect new flatwork, including from salt.
Work next to a road or a public sidewalk puts you near traffic. Keep the public out of the work with barriers, and work in the road allowance only under the municipal permit. Wet concrete burns skin, so wear gloves, long sleeves, tall waterproof boots and eye protection, and use kneeboards. Keep clear of trucks, pump booms and hoses.
The big idea
Exterior flatwork takes frost, salt, water and vehicles. It lives or dies on air entrainment, drainage, joints and curing.
The Canadian residential flatwork guide from the cement industry (Concrete Ontario) gives exposure class C-2 under CSA A23.1 for exterior flatwork exposed to chlorides and freeze-thaw: 32 MPa, a maximum water-to-cementing ratio of 0.45, and 5 to 8 percent air with 20 mm aggregate. NBC Part 9 gives 32 MPa with 5 to 8 percent air for garage floors and exterior steps (9.3.1.6). A provincial standard drawing I read for combined curb, sidewalk and driveway also asks for 32 MPa, class C-2. Confirm slump with your supplier. Do not add water on site, since it can push the mix past its water ratio.
Before you pour
Run the checklist on the Concrete Delivery & Preparation page, plus these flatwork checks.
- Base properly graded and compacted for even support. In hot weather, dampen it before the pour, with no puddles.
- Thickness and base depth come from your municipality or the drawings. Two public examples: Toronto's standard drawing for sidewalks and driveways shows a 130 mm (5 1/8 in) sidewalk, a 180 mm (7 1/8 in) driveway for industrial and high-density residential, and a 150 mm (6 in) granular A base. A Newfoundland and Labrador standard drawing gives a 150 mm (6 in) minimum for the driveway portion. A private residential driveway may differ. Confirm with your municipality.
- Slope so water runs away from the building and off the surface. Toronto's drawing shows 2% typical and 4% maximum cross slope on sidewalks. A 2% slope across a 1.2 m (3 ft 11 in) sidewalk is 1,200 × 0.02 = 24 mm (about 15/16 in) of fall.
- Steel or mesh on chairs, if specified.
- Joint layout marked, with isolation joints wherever the concrete meets structures, curbs or fixed surfaces.
- Forms straight and set to elevation.
Placing, consolidating and screeding
- Start at the farthest point and work back.
- Pull concrete with rakes. Do not drag the mesh.
- Rod or vibrate along the edges, and do not over-vibrate.
- Screed to the forms, filling low spots at once.
Example quantity. A driveway 3.6 m × 6 m (11 ft 10 in × 19 ft 8 in) at 150 mm (6 in) holds 3.6 × 6 × 0.15 = 3.24 m³ (4.2 yd³) before any allowance. The sizes are made up.
Floating, edging and finishing
- Bull float right after screeding, then apply the final texture. Keep finishing to a minimum.
- Use magnesium or aluminum floats held as flat as you can. The cement-industry guide says to avoid steel trowels, garden rakes and rolling bugs, and that air-entrained concrete should never be steel trowelled.
- Do not add water to the surface as a finishing aid.
- Edge before brooming so the edge does not tear.
- Light misting, fog spraying or an approved evaporation reducer can slow surface drying on hot or windy days.
- Apply a broom finish for traction. See Broom Finishing.
Joints
- Control joints are at least one quarter of the slab thickness deep, hand-tooled in the fresh concrete or sawn. The Portland Cement Association guidance used on the Slab and Pad Forms page puts the maximum spacing at 24 to 36 times the thickness, with panels square or nearly so (length no more than 1.5 times width). The drawings and your municipality come first.
- Isolation joints are full depth where the concrete meets other structures.
Example. A 150 mm (6 in) driveway: 24 × 150 = 3.6 m (11 ft 10 in) and 36 × 150 = 5.4 m (17 ft 9 in) as the maximum. A joint across a 6 m (19 ft 8 in) length at 3.0 m (9 ft 10 in) makes two panels of 3.6 m × 3.0 m, a ratio of 1.2. The spacing is 20 times the thickness, which is under the maximum.
Curing and protection
- Cure at least 7 days, starting right after finishing, and keep the concrete above 10°C (50°F), says the cement-industry guide. Use curing compound, poly, wet burlap, or sprinklers once the concrete is hard enough.
- No de-icing chemicals, especially in the first winter. Use sand or fine grit for traction instead.
- Sealing. The guide recommends routine sealing, typically every 1 to 2 years, after proper curing.
- Late-season pours. The guide says to avoid placing flatwork late in fall and early winter if possible, so the concrete can cure and air dry before freeze-thaw and salt.
- Below 5°C (41°F), Part 9 requires the concrete to be kept at 10°C (50°F) or warmer for 72 hours after placing (9.3.1.9).
- I did not find a Canadian source for when to walk or drive on new flatwork, so ask your supplier.
Common mistakes
- Water pooling from the wrong slope
- Mesh on the ground
- Finishing too early
- Steel troweling air-entrained concrete
- Missing or late joints
- Scaling from poor curing, no air, or early salt
Set the slope with a string line before the truck arrives. Water that sits on a slab is what destroys it.
Frost and salt are the biggest threats. Hot sun and wind can crack the surface before you finish. Rain on an unfinished slab roughs up the surface. In hot weather, schedule early and dampen the base.
Base, thickness, slope, joints and steel before the pour. Municipal inspectors may also check the work against a standard detail for sidewalks and driveway aprons.
What mix does the Canadian residential flatwork guide give for exterior concrete exposed to freeze-thaw and de-icing salts?
A driveway is 3.6 m × 6 m × 150 mm (11 ft 10 in × 19 ft 8 in × 6 in). How much concrete is that?
The same driveway has a joint across the length at 3 m (9 ft 10 in). What are the panel sizes, and is the ratio all right?
A sidewalk is 1.2 m (3 ft 11 in) wide with a 2% cross slope. How much fall is that across the width?
May you steel trowel an air-entrained driveway to get a smooth finish?
How long should exterior flatwork be cured, and when should you avoid de-icing salt?
- Must-haveLayout and checking:
- Must-havePlacing by hand:
- Rent itPlacing by machine: a chute or pump
- Must-haveScreeding and floating:
- Must-haveEdging and joints:
- Must-haveFinishing and curing:
- Must-haveConsumables:
- Must-havePPE: green-triangle boots (CSA Z195), tall waterproof boots for wet work, eye protection (CSA Z94.3), waterproof alkali-resistant gloves, long sleeves, knee pads, a hard hat (CSA Z94.1) near pump booms and trucks, and a respirator (CSA Z94.4) only as a backup to wet cutting or dust extraction
Home DIY
Laborer or helper
1st-year apprentice
Apprentice, 2nd to 4th year
Journeyperson
Lead hand or foreman
Contractor or business owner
Starting a new business
NBC Part 9 gives 32 MPa with 5 to 8 percent air for garage floors and exterior steps. Driveway and sidewalk thickness, base and slope are usually municipal standards. Provinces adopt the code with changes, so check your edition.
- ON: the City of Toronto's standard drawing for sidewalks and driveways shows a 130 mm sidewalk, a 180 mm driveway for industrial and high-density residential, a 150 mm granular A base and 2% typical cross slope on sidewalks. It is a city example, not a province-wide rule.
- NL: a provincial standard drawing for combined curb, sidewalk and driveway ramp gives a 150 mm minimum driveway thickness and 32 MPa, class C-2.
- All provinces: confirm thickness, base, slope and permit rules with your municipality, especially for any work at the road.
See Canada by Province for the full comparison.
- Concrete Care: Residential Flatwork Guide (cement-industry guide, July 2025: C-2, 32 MPa, 0.45, air, floats, 7-day cure, salt)
- City of Toronto standard drawing T-310.010-2 (sidewalk and driveway thickness, base, cross slope; a city example)
- Newfoundland and Labrador standard drawing 04120 (150 mm driveway minimum, 32 MPa class C-2)
- Vancouver Building Bylaw 2014, Division B, Section 9.3 (9.3.1.6, 9.3.1.9)
- CSA A23.1 was not read directly. Joint spacing rule is from Portland Cement Association guidance used on the Slab and Pad Forms page.
- Volume, slope and joint arithmetic are calculated and re-checked.
Last reviewed October 2026. General information, not engineering or legal advice.