Pad Placement
Reviewed by a working tradesman with 17+ years in the field.
Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure
Pads carry equipment such as heat pumps, generators and pumps. They have to be flat, solid and strong at the edges.
Tap your level and the boxes below open to the advice for you. Remembered on this device.
By the end you can
- Find the pad size, thickness and level the equipment maker requires.
- Place and finish a small pad flat with tight edges.
- Set anchors or sleeves to the maker's layout.
- Know when the equipment can go on the pad.
Stay away from power, gas and refrigerant lines, and leave all hookups to licensed trades. Call before you dig for the base, because small pads sit close to buried services. Wet concrete burns skin, so wear gloves, long sleeves, tall waterproof boots and eye protection, and use kneeboards or knee pads.
The big idea
Pads carry equipment such as heat pumps, generators and pumps. They have to be flat, solid and strong at the edges, because a pad that rocks or cracks shortens the life of what sits on it.
Pads are ordered and tested to CSA A23.1 and A23.2, but the code does not set a pad size or thickness. The equipment maker's instructions do, and some are part of the permit, so keep them on site.
What the maker asks for
Get the installation manual before you form. As an example of what a maker can ask, one generator maker's support page gives:
- A concrete pad about 5 in (127 mm) thick.
- A pad at least 3 in (75 mm) larger than the generator footprint. Its sheet lists 51 in × 28 in (1,295 mm × 711 mm) for a 48 in × 25 in (1,219 mm × 635 mm) unit.
- The generator level within 0.5 in (13 mm).
- Anchoring with 3/8 in (M10) lag bolts, with embedment depth set by the local inspector if the code requires anchoring.
For heat pumps, a general HVAC article says most residential pads are four to six inches (100 to 150 mm) thick, slightly larger than the unit base, on a compacted gravel layer, with rebar or mesh at mid-depth if the maker or code calls for it. It also suggests about 1/8 in per foot (about 10 mm per metre) of fall away from the unit. That is general advice, not a maker's requirement, and a maker may ask for a level pad. The manual for your unit decides.
Example quantity. A pad 1.3 m × 0.8 m (4 ft 3 in × 2 ft 7 in) at 127 mm (5 in) is 1.3 × 0.8 × 0.127 = 0.13 m³ (0.17 yd³). The sizes are made up. Ask your supplier about small loads.
Before you pour
Run the checklist on the Concrete Delivery & Preparation page, plus these pad checks.
- The base is compacted and level, and the pad thickness and edge height match the maker's instructions.
- Steel or mesh is on chairs, and forms are level and tight.
- Anchor locations or sleeves are in place, set from the maker's template.
- Services are located and the pad clears them.
The code names garage and carport floors and exterior steps (32 MPa with 5 to 8 percent air) but not equipment pads (Part 9, 9.3.1.6). A pad outdoors sees the same frost and wet. Ask your supplier for an exterior flatwork mix, with the exposure class, and use the maker's number if it asks for more.
Placing and finishing
- Fill edges and corners first, then the middle.
- Use rakes to pull concrete and do not disturb the steel.
- Rod small pads, and use a small vibrator on thick ones.
- Screed to the level the maker asks for. Check across the pad with a long level before the concrete stiffens.
- Float to close the surface. Trowel after the bleed water is gone, if a smooth finish is specified. See Slab Placement for the finishing sequence.
- Round the edges with an edger so they do not chip.
Curing and loading
- Cure with compound or a cover. Below 5°C (41°F), Part 9 requires the concrete to be kept at 10°C (50°F) or warmer for 72 hours after placing (9.3.1.9).
- Do not set equipment on the pad until it has the strength the equipment maker or engineer asks for. A trade article says on-site pads take several days to harden, and pre-cast pads up to a week. Follow the maker's instruction.
- Anchor the unit to the maker's template.
Common mistakes
- Pad not level
- Steel on the ground
- Finishing too early
- Weak edges
- Not enough curing
- Loading before strength
- Forming without the maker's instructions
Set a long level across the pad before the concrete stiffens. Dead flat now saves shimming forever.
Hot weather dries the surface fast. Cold delays the set. Plan finishing around the conditions.
Base, thickness, steel and level. Some equipment makers' instructions are part of the permit, so keep them on site.
A maker says its generator pad should be about 5 in thick. How many millimetres is that, and how much concrete is a 1.3 m × 0.8 m pad (4 ft 3 in × 2 ft 7 in)?
The maker says the unit must be level within 0.5 in. How many millimetres is that?
Where does the weight of the equipment go if the base under the pad is soft?
Why round the pad edges with an edger?
When can the equipment go on the pad?
May you connect the gas, electrical or refrigerant lines because you are already there?
- Must-haveLayout and checking:
- Must-havePlacing by hand:
- Must-haveConsolidating a small pad: a rod
- Rent itConsolidating a thicker pad: a hand vibrator
- Must-haveFinishing:
- Must-haveConsumables:
- Must-havePPE:
Home DIY
Laborer or helper
1st-year apprentice
Apprentice, 2nd to 4th year
Journeyperson
Lead hand or foreman
Contractor or business owner
Starting a new business
The technique is the same across Canada. What changes is the code edition and local permit rules. NBC Part 9, Section 9.3.1 gives 28-day minimums of 15 MPa for footings and walls, 20 MPa for floors and 32 MPa for garage and carport floors and exterior steps. Provinces adopt the code with changes, so check your edition. I did not re-verify provincial code editions on this pass, so confirm yours with the local authority.
See Canada by Province for the full comparison.
- Generac support, Requirements for mounting a home standby generator to concrete (a maker's page: about 5 in, 3 in larger, 0.5 in level, lag bolts; one example)
- PickComfort, Heat pump concrete pad (general HVAC advice, not a maker's requirement)
- AP Electric, The base for a standby generator (trade article: cure times)
- Vancouver Building Bylaw 2014, Division B, Section 9.3 (9.3.1.6, 9.3.1.9)
- CSA A23.1 was not read directly. Always follow your own unit's installation manual.
- Volume and unit conversions are calculated and re-checked.
Last reviewed October 2026. General information, not engineering or legal advice.