Rebar Chairs and Spacers

Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

The supports that hold the steel at the height and cover the drawings give, so it cannot sink, float or touch the form.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isThe supports that hold the steel at the height and cover the drawings give.
Why it mattersWithout them bars sink, float, shift or touch the form. They cost little next to the problem.
The hard ruleProper supports only. Never wood, bricks, rocks or scrap.
Where numbers come fromThe drawings and the maker's data, not habit.

By the end you can

  • Name the common chairs and spacers and what each is for.
  • Pick a support to match the cover on the drawings.
  • Work out how many chairs a slab needs from a spacing.
  • Handle wet soil and vapour barriers without losing cover.
  • Test the steel before the truck arrives.
Stop and read

Steel that is not held up is steel that moves, and loose chairs and bars are trip and impalement hazards. Cap vertical bars where people work above or beside them (see Rebar Placement), wear gloves and knee pads, and do not walk on mats between chairs. Never use wood, bricks or rocks to prop the steel.

The big idea

Rebar chairs and spacers hold the steel where the drawings put it. Without them, bars sink into the base, float up, shift or touch the form. They cost very little compared to the problem they prevent.

Why use them

  • Keep the required concrete cover
  • Hold the steel at the right height
  • Stop bars moving while concrete goes in
  • Keep steel centred in a wall
  • Protect the steel from corrosion

Types of chairs and spacers

  • Plastic slab chairs: under mesh and bars in slabs and pads.
  • Continuous chairs: a long support for mats and heavy bars.
  • Concrete blocks (dobies): under footing bars, where they bear on the soil without sinking.
  • Wall spacers: plastic or concrete units that keep bars off the form face.
  • Rebar wheels: for round columns and curved forms.
  • Beam bolsters: for heavy bars in grade beams and structural slabs.

Where steel sits next to an exposed concrete face, one municipal specification (City of Winnipeg, Section 03200) requires plastic-coated supports, and says broken concrete blocks and wood supports are not acceptable. Check what your drawings and specification require.

Matching the support to the cover

The support height is the cover. The cover comes from the drawings, and from CSA A23.1 and A23.3. Commonly quoted values are about 75 mm (3 in) for concrete cast against soil and as little as 20 mm (3/4 in) for interior slabs, but they are not a substitute for the drawing (see Rebar Placement).

Example. The drawings call for 75 mm (3 in) under footing steel. Dobies that are 65 mm (2 9/16 in) tall leave the steel 10 mm (3/8 in) low everywhere, so the cover is short and the footing fails inspection. Use 75 mm supports.

Confirm

The support spacing for your job is in the support maker's data and the engineer's drawings. I found no single Canadian number. For scale only, an Australian standard cited in a supplier guide sets a maximum of 0.8 m (2 ft 7 in) between supports for building slabs, with heavier bars needing closer spacing. Do not use it in place of your drawings.

Counting chairs

For a rectangular slab on a square grid at spacing s: lines = length ÷ s, rounded up, plus 1, in each direction, and chairs = lines × lines.

Example. A 6 m × 6 m (19 ft 8 in) slab on a 0.8 m (2 ft 7 in) grid: 6 ÷ 0.8 = 7.5, round up to 8 spaces, so 9 lines each way. 9 × 9 = 81 chairs. Staggering the lines by about 200 mm (8 in) from their neighbours helps avoid a straight line of weakness, per the same supplier guide.

Using them properly

  • Place chairs at regular spacing so the steel does not sag between them.
  • Use continuous chairs for heavy mats.
  • On soil, use a base that will not sink under the load. Plastic chairs on wet ground can punch in.
  • On a vapour barrier, use chairs with wide bases that will not puncture it.
  • Use wall spacers to keep bars centred in the form.
  • Re-check height after tying. Ties can lift or pull a bar.
  • Do not use wood, rocks, brick or scrap. Wood rots and rocks shift, and both create paths for water to reach the steel.

Where each one goes

Footings

Concrete blocks or approved supports under the bars, cover kept from the soil as drawn, and bars held so they cannot move during the pour.

Foundation walls

Wall spacers keep the bars off the form faces, evenly spaced along the vertical bars, with cover checked at corners and openings.

Slabs and pads

Plastic chairs under mesh and mats, sitting flat and stable, at the spacing the maker's data and drawings say.

Stairs and landings

Small chairs or blocks under landing mats, supports for bars in risers and treads, and cover kept at nosings.

Retaining walls

Heavy-duty spacers for thick walls, more cover on the earth side as drawn, and alignment checked before the pour.

Common mistakes

  • Rebar touching soil or the form
  • Debris used as supports
  • Too few chairs, so the steel sags
  • Chairs tipping or sinking during the pour
  • Cover too small, which fails inspection
Pro note

Chairs are cheap and a failed inspection is not. Use more than you think you need. Walk the steel before the truck arrives and press on it. If it moves, it will move during the pour too.

Weather note

Wet soil can let chairs sink. Hot sun softens plastic chairs on a dark vapour barrier. Cold makes plastic brittle and it can snap under a boot. Choose the type to suit the conditions and re-check height before the pour.

What the inspector looks at

Cover, support spacing, and any steel touching the soil or the form. Bars out of position must be fixed before concrete goes in.

✅ Check yourselfTap a question
The drawings call for 75 mm (3 in) cover under footing steel, and your dobies are 65 mm (2 9/16 in). What is wrong?
The steel will sit 10 mm (3/8 in) too low, so cover is short at every point. That fails the inspection. Use 75 mm supports, or the size the drawings give.
A 6 m × 6 m (19 ft 8 in) slab needs chairs on a grid no wider than 0.8 m (2 ft 7 in). How many chairs?
6 ÷ 0.8 = 7.5, so round up to 8 spaces and 9 lines of chairs each way. 9 × 9 = 81 chairs. The spacing in your job comes from the maker's data and the drawings.
May you use a piece of brick or a wood block as a chair?
No. Wood rots and bricks and rocks shift, and both create paths for water to the steel. Use proper plastic or concrete supports.
You press on the steel the morning of the pour and it springs down 15 mm (5/8 in). What does that tell you?
It will move during the pour too. Add chairs, or use continuous chairs, before the truck arrives.
Why must you re-check bar height after tying?
Ties can lift or pull a bar out of position, and walking on the steel can crush chairs. Measure the cover again before the pour.
Plastic chairs are going on wet soil under a footing mat. What can happen?
They can punch into the soft ground and let the steel drop below its cover. Use wider-based supports, blocks designed to bear on soil, or fix the base first.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-haveSupports for slabs:
  • Must-haveSupports for footings: concrete blocks (dobies) rated to bear on the soil without sinking
  • Must-haveWall spacers: plastic or concrete wall spacers to keep bars centred and off the form face
  • Must-haveSpecial supports:
  • Must-haveTying:
  • Must-haveChecking:
  • Must-haveVapour barrier work: chairs with wide bases so they do not puncture the barrier
  • Must-havePPE:
👷 Who can do thisTap your level
Home DIY
A capable owner can set chairs and spacers on simple jobs. Use the cover and spacing on the drawings, never wood or rocks. If the steel is engineered, have the engineer or inspector check it before the pour.
Laborer or helper
Set chairs where your lead marks them, and use only proper supports, never wood or rocks. Press on the steel and tell your lead if it moves. Watch for chairs that tip or sink on wet ground.
1st-year apprentice
You can place chairs and spacers at regular spacing, check height after tying and re-check cover under supervision. Learn the cover figures on the drawings first.
Apprentice, 2nd to 4th year
Place chairs at the spacing you are shown, then re-check bar height after tying. Measure cover with a tape at several points. Report any low spot to your journeyperson. Learn why plastic chairs can sink on wet ground or puncture a vapour barrier.
Journeyperson
You own the cover, support spacing and final check. Stop-work trigger: cover below the drawing figure at any point. Add supports for wet soil, a vapour barrier or heavy bars rather than accept sagging steel.
Lead hand or foreman
Walk the steel before the truck arrives and press on it. Any point below the drawing's cover stops the pour. Add supports where the ground is wet, a barrier is present or the bars are heavy. Re-check after the crew has walked on it.
Contractor or business owner
Price supports as a small line item and do not skimp. Photograph and measure cover before the pour and keep the photos with the job file. Ask your lawyer or insurer who carries the liability for poor cover.
Starting a new business
Keep a small stock of proper chairs, spacers and wall ties on hand and put them in the price. Write down your cover check in the job file with photos. Confirm the cover and spacing with the engineer, and ask your insurer who pays when cover fails.
By Province:

This technique is the same across Canada. Cover and support spacing come from CSA A23.1 and A23.3 and the drawings, not the province. What changes is when inspections happen.

  • BC: Vancouver inspects after the formwork and before the pour. Other local governments set their own stages.
  • SK: Regina has a foundation inspection after rebar and before pouring. Saskatoon has a footing inspection after the pour and stripping.
  • ON: notify the building department when ready to construct footings, and at substantial completion of footings and foundations, before backfilling.
  • Everywhere else: confirm the inspection stages with the local authority.

See Permits and Approvals for the stops, and Canada by Province for the comparison.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.