Water Control
Reviewed by a working tradesman with 17+ years in the field.
Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure
Keep water out of the dig, get it out when it gets in, and send it somewhere legal.
Tap your level and the boxes below open to the advice for you. Remembered on this device.
By the end you can
- Name where water on a site comes from.
- Keep surface water out of the hole, and pump from a sump outside the footing line.
- Work out how much water is in a hole and how long a pump takes to clear it.
- Settle silty water before it leaves the site, and know when pumping needs a permit.
- Know when water makes a trench unsafe, and when to call an engineer.
Never enter a flooded or wet trench at any depth, and never enter one over 1.2 m (4 ft) deep that is not sloped or supported. Wet ground is weaker than it looks, and water pressure behind a wall can bring it down. If water is coming in faster than you can pump it, stop, get everyone out and have the area assessed before anyone goes back in.
The big idea
Water is the thing that most often turns a good excavation into a bad one. It weakens trench walls, softens the soil under your footings, floats forms, ruins rebar and concrete, and if it leaves your site carrying mud it can bring a fine. Plan where the water goes before you dig.
Water control touches worker safety (provincial OHS rules), municipal bylaws and federal environmental law. The building code covers how water is kept away from the finished foundation, covered on the Waterproofing and Drainage pages.
Know where the water comes from
- Surface water: rain, runoff from neighbouring lots, snowmelt
- Groundwater: a high water table, or seepage through the walls and floor of the dig
- Existing pipes: a leaking water main, drain or old tile line
- Your own site: washing tools, concrete washout, pump discharge going in circles
Controlling surface water
- Grade the ground so water runs away from the excavation, not into it
- Cut a diversion ditch or build a berm upslope of the dig
- Keep spoil piles from acting as dams or channels (see Spoil Pile Management)
- Cover exposed slopes with poly or erosion blankets before a storm
How much water is that?
Rain on an open hole adds up fast. Area × depth of rain gives the volume. For a 10 m × 12 m hole: 120 m² × 0.025 m (25 mm of rain) = 3.0 m³, about 3,000 L. In feet, 1,292 ft² × 1/12 ft (1 in) = 108 ft³. A pump that moves 200 L/min (about 53 US gal/min) takes 3,000 ÷ 200 = 15 minutes to clear it, but only if nothing keeps flowing in.
Controlling water in the hole
- Dig a sump pit at a low corner, outside the footprint of the footings, and pump from it
- Use a pump rated for solids if the water carries silt. Clean intake screens often
- Never leave a pump unattended near an unsupported trench without a plan if it stops
- Never let water sit under a footing. Remove it and any softened soil before pouring
Water in an excavation is covered by your provincial OHS regulator. In Alberta, workers may not enter an excavation until hazardous accumulations of water are eliminated (OHS Code s. 445). Wet ground can make a trench less stable, so have a competent person reclassify the soil. Water pressure behind a wall is one of the things that brings an engineer in. See Trench Safety and Utility Trenching.
BC's Part 20 wording on accumulated water, and the matching rule in your province, were not re-read for this page. Read the section in your regulation.
High water table and large dewatering
Well points, deep wells and long-running pumping change the water balance around neighbouring buildings, and can pull fines out of the soil and cause settlement. These are engineered jobs. If the water table is above your footing level, talk to a geotechnical engineer before you start.
Where the pumped water goes
- Never pump muddy water into a storm drain, ditch, creek or onto a neighbour's lot.
- Let silty water settle first: a settling pit, a filter bag, or a straw bale and fabric filter.
- The federal Fisheries Act says no person shall deposit, or permit the deposit of, a deleterious substance of any type in water frequented by fish, or where it may enter such water (s. 36(3)). Treat silty water as a pollutant and keep it out of creeks and storm drains.
- Many municipalities have erosion, sediment or storm-sewer bylaws with their own fines and permit conditions.
- Ontario: a Permit to Take Water is required to take 50,000 L or more in a day, unless the taking is exempt or needs a registration instead. At 200 L/min a pump reaches 50,000 L in 250 minutes, about 4 hours 10 minutes (about 13,200 US gal).
Whether dewatering needs a permit or registration, and how silty water must be treated, differs between provinces and municipalities, and between storm and sanitary connections. Ask your municipality before you pump. Ontario's separate rules for construction dewatering were not read for this page.
During concrete work
- No standing water under footings, slab bases or in wall forms at the time of placement
- Keep water off the rebar zone and out of the forms
- Cover fresh concrete before rain. Rain on a fresh surface weakens it
- Pumping next to a fresh pour can wash out cement. Keep discharge away
Common mistakes
- No drainage plan before the excavator arrives
- Pumping water to a place where it runs straight back in
- Discharging silt to a storm drain or a neighbour's property
- Pouring footings onto softened ground
- A pump with no backup, or a clogged intake, running unattended
- Spoil placed where it channels runoff into the hole
Sketch the water path on the site plan on day one: where it comes from, where the sump is, where the discharge goes, and what happens if the pump quits. Put the sump in early. It is far easier to dig a sump in a dry hole than to chase water around a wet one.
Heavy rain, as on the BC coast, can fill a hole overnight, so cover slopes and check pumps before leaving. Where winters are cold, spring snowmelt over frozen ground sends runoff straight to the lowest point on your site, which is usually your excavation.
Footings must sit on suitable ground, free of water and frost. How water is kept away from the finished foundation (drain tile or a granular layer at the bottom of exterior walls, a sump, surface grading) is NBC Part 9, Section 9.14. Your local building official may ask for a geotechnical report on wet or high water-table sites. See the Waterproofing and Drainage pages.
The excavation is 10 m × 12 m and it rains 25 mm (1 in) overnight. About how much water ends up in the hole, if none drains away?
A pump moves 200 L/min (about 53 US gal/min). How long to clear those 3,000 L?
In Ontario, a permit to take water is needed at 50,000 L per day or more. How long does a 200 L/min pump take to reach that?
Water is standing at the bottom of the footing trench. May you pour?
Your pump discharge is muddy and the nearest low spot is the street storm drain. What do you do?
The pump stops overnight and the water rises on the trench wall. Before anyone goes in, what must happen?
- Rent itPumping:
- Must-haveSettling and filtering:
- Must-haveDiverting water:
- Must-haveChecking the base:
- Must-haveCleanup: a wheelbarrow or buggy, a flat shovel and a broom to remove softened soil before placing concrete
- Must-haveWet-weather PPE:
Home DIY
Laborer or helper
1st-year apprentice
Apprentice, 2nd to 4th year
Journeyperson
Lead hand or foreman
Contractor or business owner
Starting a new business
Where pumped water goes is set mostly by municipal bylaws and the federal Fisheries Act, so this topic varies by city more than by province.
- BC: worker safety is OHS Reg. Part 20; confirm the section on accumulated water. Ask your municipality about sediment and storm-sewer rules.
- AB: OHS Code s. 445 keeps workers out of an excavation until hazardous accumulations of water are eliminated.
- ON: a Permit to Take Water is required at 50,000 L or more per day, unless exempt or registered instead. Confirm with the Ministry of the Environment.
- MB: confirm perimeter drain discharge rules with the provincial building code office.
- Everywhere else: ask the local authority about dewatering permits and discharge.
See Canada by Province for the full comparison.
- Fisheries Act, s. 36 (deposit of deleterious substances)
- Ontario, Permits to take water (the 50,000 L per day threshold)
- Alberta OHS Code Explanation Guide, Part 32 (s. 445, water hazard; the 2009 guide)
- Vancouver Building Bylaw 2014, Division B, Section 9.14 (drainage, same structure as NBC Part 9)
- Volume and pump-time arithmetic is calculated and re-checked.
Last reviewed October 2026. General information, not engineering or legal advice. Check the current regulation and your local bylaws.