Written for Canada. Plans are metric, but many crews and suppliers work in feet and inches, so this site gives both: millimetres and metres, with feet and inches beside them. Codes are the National Building Code of Canada 2020 (NBC 2020) Part 9 as your province adopts it. A number marked Confirm has not been checked against every province, so check it with your own authority before you act on it.

Reviewed by a working tradesman with 17+ years in the field.

Some links on this site are affiliate links. If you buy through them we may earn a commission at no extra cost to you. Affiliate disclosure

What to ask, what to submit and which inspections to book, before you price the job or put a shovel in the ground.

I am a:

Tap your level and the boxes below open to the advice for you. Remembered on this device.

What it isHow to find out what permits, approvals and inspections your foundation job needs, before you price or dig.
The first moveCall or visit the building department for the property. Their answer overrides this page.
The hard ruleNever pour or cover work that is waiting on an inspection.
Also before you digBook your utility locate. Allow 3 business days anywhere.

By the end you can

  • Say who issues the permit for your job and what to ask them.
  • Tell structural work, which needs a permit, from flatwork, which often does not.
  • List the documents an application usually asks for.
  • Book the inspection stops in the right order and know what fails them.
  • Book a utility locate and know which buried lines it will not find.
Stop and read

Do not pour, backfill or cover any work that is waiting on an inspection. Do not start digging until the locate is back and the lines are marked. An inspector cannot inspect a trench that is not safe to enter, and nobody goes into a trench deeper than 1.2 m (4 ft) unless it is protected.

The big idea

A permit is how your work gets checked against the building code, zoning and safety rules. Unpermitted structural work can mean a stop-work order, tear-out, trouble with insurance and problems when you sell. The cheapest tool in this whole stage is a five-minute call.

The National Building Code of Canada is a model code. It has no force until a province or territory adopts it, and many adopt it with changes. The permit itself usually comes from the local authority: a city, town, district or municipality in BC, AB, SK, ON and QC. In PEI the province issues permits outside Charlottetown, Stratford, Summerside and St. Felix. In Nunavut permits go through the Office of the Chief Building Official. Elsewhere, ask your municipality who issues it.

Six-panel drawing of the typical inspection order for a foundation: excavation, footing forms and rebar, wall forms and rebar, damp-proofing and perimeter drain tile, under-slab gravel, and backfill.
Typical inspection stops. The order and the number are set by your building department and printed on the permit. Treat this as an example, not a rule.

Who issues what

Using BC as the example. In other provinces the same jobs are done by different bodies, so ask your local building department and provincial regulator.

ApprovalWhoNote
Building permitLocal government building departmentUnder the BC Building Code and its own building bylaw.
Zoning, setbacks, height, coverageSame local government, under its zoning bylawA permit can be refused over setbacks even when the structure is perfect.
Electrical, gas, plumbingProvincial regulator and/or local building departmentAsk which one at the counter.
New home by an owner-builderBC Housing (Homeowner Protection Act)Exam, then an Owner Builder Authorization.
Near water, farmland or First Nations landProvincial, federal or First Nations authoritiesSee Other approvals below.

If you build your own home

The rules differ a lot by province. These are the ones we checked against the official pages.

  • BC. You must pass an exam and get an Owner Builder Authorization from BC Housing before you build. If you sell within 10 years of construction you stay personally liable for defects and must give buyers a disclosure notice. In most cases you cannot list the home until it is finished and you have lived in it for at least a year.
  • AB. Owner Builder Authorization under the New Home Buyer Protection Act, for a single-family site-built home for personal use. You must be a registered owner, plan to keep the home 10 years, and manage the construction yourself. The fee is $95 with warranty or $750 without. Without warranty you cannot sell or offer to sell during the 10 years, and a caveat goes on the title (authorizations issued from 1 December 2025). The authorization lets you get building permits without a builder licence. Lenders may require warranty, so ask yours first.
  • ON. Get a Tarion Letter of Confirmation before you apply for a permit. Owner-built homes carry no statutory warranty.
  • SK, MB, QC and others. See the By province table. Where it says Confirm, we have not checked the source yet.

Do I need a permit?

There is no national rule that says "under X it needs no permit". Each authority sets its own thresholds. Most departments think about the work in these groups.

WorkTypical result
Footings, foundation walls, grade beams. Slabs that carry walls or posts. Any slab attached to a building.Building permit and a series of inspections. Treat as always required unless the department tells you otherwise in writing.
Full foundations, basement excavation, frost walls, sealed crawl spaces, engineered slabs.Building permit, several inspections, often engineer's drawings or a geotechnical report.
Retaining walls, especially near a property line, road, slope or building.Permit and an engineer's design once the wall passes a certain height or carries a surcharge. The height varies by municipality.
Walkways, patios and pads that do not support a structure.Often no building permit, but not always. Drainage changes, driveway approaches and work in a utility right-of-way can need their own approval.
Excavation, grading, utility trenching, clearing, large fill or soil movement.Depends on the municipality. Many have soil-removal, fill or tree bylaws, erosion control rules and separate permits for driveway crossings.
Red flags that mean "get a permit"
  • Anything attached to a building or carrying new load
  • Changing drainage or sending water onto a neighbour or the road
  • Digging near utilities, a property line or an existing structure
  • New plumbing, gas or electrical
  • New driveway access, culverts or work in the road allowance
  • Building near a stream, a steep slope or the setback line

The steps

  1. Call the building department for the address. Say exactly what you plan to build. Ask what permits, drawings, reports and inspections it needs.
  2. Get the application checklist. Departments differ on what they check at the counter, such as owner-builder authorization or warranty proof.
  3. Assemble the documents. See the list below. Order a survey or geotechnical report early, since they take weeks.
  4. Submit, pay and wait. Ask how long review takes at the moment and build it into your schedule.
  5. Post the permit and keep the approved drawings on site. Most authorities want both available to the inspector, and many want the permit card visible.
  6. Book each inspection with notice. The stops and the notice period are on your permit. Do not pour or cover until the stop has passed.
  7. Photograph everything. The permit, the drawing revision stamp and every passed inspection card, dated.

Documents you may be asked for

  • Approved construction drawings: plans, sections, details
  • A site plan, often based on a survey by a licensed land surveyor
  • Structural drawings and an engineer's stamp where required
  • A geotechnical report if the soil, slope or water table calls for one
  • Drainage and erosion and sediment control plans
  • Energy and envelope compliance information for new buildings
  • Letters of Assurance where the building requires them

Letters of Assurance (BC)

In BC these signed documents are how architects and engineers accept responsibility for design and field review. Ask the counter which Part 9 buildings need them and whether your geotechnical engineer has to sign one. Other provinces use their own sign-off systems. In Ontario, for example, designers need a BCIN.

ScheduleWhat it doesWhen
AConfirms a Coordinating Registered Professional has been hiredWith the permit application
BA Registered Professional of Record takes responsibility for a component and its field reviewsBefore that component is built
C-A, C-BConfirm the professionals finished their dutiesAfter completion, before occupancy or final inspection

Inspection stops for a foundation

Where we verified the stops (examples in BC, SK, ON, NB, NS, PE and Whitehorse), foundation work is inspected before it is covered. Your permit has the real list. A typical sequence:

  1. Excavation and bearing soil Sometimes with the geotechnical engineer's field review.
  2. Footing forms and reinforcement Before any concrete goes in.
  3. Foundation wall forms and reinforcement If the walls are poured.
  4. Damp-proofing and perimeter drain tile Before backfilling.
  5. Under-slab Gravel, vapour barrier, insulation and any under-slab plumbing, before the slab is poured.
  6. Backfill or grading Some departments inspect this too.
Inspector's view

Inspectors fail footings for plain things: standing water in the bottom, disturbed or frozen soil, forms off line or out of level, rebar not on chairs or at the wrong cover, and the drawings not on site. Book with notice, have the approved drawings there, and make the site safe to enter.

Utility locates

Contact your province's one-call service before you dig. Locates are free. Private lines are not mapped by the service. The numbers below were checked against official or utility pages in October 2026, but take the number from the current official page before you call.

ProvinceServiceNoticeNote
BCBC 1 Call, bc1c.ca, 1-800-474-6886 (*6886 from a cell)3 full business daysBC Energy Safety (Technical Safety BC) calls it a free service and recommends it before any digging. Check whether your municipality or utility makes it a condition of your permit.
ABAlberta One-Call, 1-800-242-3447, web requests 24/73 full business daysUtility Safety Partners says members need a minimum of 3 full business days. Private lines are not located (see below).
SKSask 1st Call, 1-306-777-9507 (office line)2 full working days (SaskEnergy). The City of Regina asks for 3 business days for its own lines.Allow 3. Confirm the current request number and web portal with Sask 1st Call.
MBClick Before You Dig Manitoba, clickbeforeyoudigmb.com, 1-800-940-3447They contact you within 3 business days with a locate dateManitoba Hydro says homeowners need to use it before digging deeper than 15 cm (6 in). The locate is valid for 14 days; if work has not started, have the lines re-marked.
ONOntario One Call (now Ontario Dig Authority)Confirm (5 business days was the figure on our old page)Ontario has a law on this (Underground Infrastructure Notification System Act, 2012). Confirm the lead time and your duties with Ontario One Call before you dig.
QCInfo-Excavation, info-ex.com4 working daysThe RBQ calls the request essential and lists it as a contractor responsibility. A request stays valid up to the work end date you enter, for a maximum of 180 days.
NS, NB, PE, NLConfirm with your utilitiesConfirmSources for these provinces conflict or are missing, so we are not printing a number we cannot stand behind.
YT, NT, NUNo territory-wide one-call that we could confirmConfirmCall the power, telephone and gas utilities for your town directly.
What a locate does not find

Private lines: sprinklers and irrigation, a line from the house to a shed or garage, septic tanks, tile beds, well pipes, and the water and sewer from the property line to your house. Find those yourself or hire a private locator. Hand tools can still damage a line, so follow the hand-expose zones on the locate report before any machine digs.

Other approvals people forget

  • Archaeology and heritage. If you find bone, shell midden, stone tools or other unusual material, stop work in the area, leave everything in place and report it. Every province has a process, and on or near First Nations land local First Nations may also need to be consulted. In BC the Heritage Conservation Act protects archaeological sites on private land too; contact the Archaeology Branch.
  • Streams, wetlands and riparian areas. Provincial and federal rules and local setbacks can restrict work near water. Ask before you clear or dig.
  • Agricultural Land Reserve (BC). Extra rules on soil removal, fill and non-farm use.
  • Contaminated or imported soil. Moving soil on or off site can be regulated.
  • Worker safety. Your provincial OHS regulator sets rules for workers on site, whether or not a permit is needed. Who counts as the responsible constructor differs by province. In NB and NS the owner is deemed the constructor where no one else controls the work. In Ontario the OHSA does not cover an owner's own work on a private residence, but an owner who hires several contractors with no general contractor is likely the constructor.
  • Hiring help and workers' compensation. In BC a homeowner must register with WorkSafeBC if a one-time project reaches 24 or more total hours across all workers, or ongoing work runs 8 or more hours a week. In NB a homeowner generally cannot register unless they are an employer. In NL a homeowner employing people at a private residence is not required to register. Ask your board before you hire anyone.
Confirm

Riparian setback distances (30 m is commonly quoted) depend on the stream and the local bylaw and have not been checked here. Heritage phone numbers and the AB and MB trench-depth rules are being verified as those pages are rebuilt.

Common mistakes

  • Pricing before asking. The department's answer changes the job. Call first.
  • Booking concrete before the inspection. Inspectors have their own schedule. Never pour on a stop that has not passed.
  • Trusting the locate for private lines. It does not find them.
  • Drawings not on site. An easy fail, and it costs a day.
  • Treating a field change as minor. Send it to the designer or building department in writing.
✅ Check yourselfTap a question
The permit costs money and the job is small. Can you skip it if the slab is only 10 m²?
No rule says under a certain size needs no permit. Each local authority sets its own. A slab attached to a building or carrying a wall or post is structural and almost always needs one. Ask the building department for that address, and get the answer in writing.
What is the difference between a building permit and a utility locate?
The permit is your authority's approval to build. The locate is the utility owners marking where their buried lines are. You need a locate even when no permit is required, and a permit does not replace one.
The footing forms are done and the inspector cannot come until Thursday. The truck is booked for Wednesday. What do you do?
Move the truck. Never pour or cover a stop that has not passed. Re-book the concrete, and photograph the forms and rebar so the record is clear.
Which lines will a one-call locate not mark?
Private lines: sprinklers, irrigation, a line from the house to a shed or garage, septic tanks, tile beds and well pipes, and the water and sewer from the property line to the house. Arrange a private locate or find them yourself.
You find a bone and a flaked stone tool while digging. What now?
Stop work in that area, leave everything in place and report it to your provincial heritage authority. Do not move the material or keep working nearby. Penalties are serious.
Who is responsible for site safety on an owner-built job?
It depends on the province. In some provinces the owner is the constructor or employer where no one else controls the work. Ask your provincial OHS regulator before you hire anyone.
🧰 Gear for this stepMust-haveRent itNice to have
  • Must-havePaper and records:
  • Must-haveCamera:
  • Must-haveTapes:
  • Must-haveMarking paint or stakes to show the footprint to the inspector
  • Must-haveHard hat (CSA Z94.1), safety glasses (CSA Z94.3) and green-triangle footwear (CSA Z195) for any inspection visit
  • Rent itLaser or builder's level with a grade rod, so you can show the inspector elevations
  • Nice to haveA weatherproof permit box or board to post the permit and drawings
👷 Who can do thisTap your level
Home DIY
You can gather the drawings, call the building department, fill out the application and book inspections. Do not start structural, electrical, gas or plumbing work without a permit. Do not hire or direct workers until you know your province's owner-builder and workers' compensation rules. Hire a designer or engineer when drawings, a geotechnical report or a stamp is required.
Laborer or helper
Carry drawings, hold the permit card and keep the site tidy for the inspector. You do not book, sign or cancel inspections. Never cover or pour a stop that has not passed, and tell your lead right away if someone asks you to.
1st-year apprentice
Carry the permit and drawings on site, keep the inspection cards and photos, and learn the inspection stops. Never pour or cover work before the required inspection has passed.
Apprentice, 2nd to 4th year
Learn which inspection stops apply before you cover work, and keep dated photos of each one. Check with your journeyperson that you are building from the current approved drawings. Never decide on your own that a field change is minor.
Journeyperson
You make sure the work matches the approved drawings and that every stop is inspected before you cover it. Your stop-work trigger is any field change to the approved drawings, or a stop that has not yet been inspected. Wait for the designer or the building department before you build or cover.
Lead hand or foreman
Post the permit and current drawings on site and book each inspection before the work is covered. Hold the crew at any stop not yet passed. Send field changes to the designer or building department in writing. You do not approve changes yourself.
Contractor or business owner
Check the builder licence, new-home warranty enrolment, workers' compensation registration and liability insurance your province requires. Price permit fees, inspection waits and locates. Keep the permit, inspection cards and dated photos in the job file. Ask your lawyer or insurer who carries the liability for unpermitted work.
Starting a new business
Before taking a permitted job, ask the building department who may apply, and ask your provincial authority what licence, warranty enrolment and registration apply. Build inspection waits into your schedule. Have a lawyer review contracts where unpermitted work could be involved.
By Province:

NBC 2020 Part 9 sets the model rules, but who issues the permit, who may owner-build and when inspections happen are provincial and municipal.

Sources:

Last reviewed October 2026. General information, not engineering or legal advice.